Issue For Construction definition
Issue For Construction. Protection, Control & Communication drawings 06/2016 Developer Start construction of SUF and CTOAF (115kV ▇▇▇▇▇▇ Substation) 06/2016 Developer Start construction of DAF (35kV JR Station) below ground and above ground. 06/2016 Developer Issue Relay Coordination Study 07/2016 Developer Complete construction of SUF (115kV ▇▇▇▇▇▇ Substation) 09/2016 Developer and Connecting Transmission Owner Complete construction of CTOAF (115kV ▇▇▇▇▇▇ Station) 09/2016 Developer Complete construction of partial DAF (35kV JR Station) effecting CTOAF/SUF (115kV ▇▇▇▇▇▇ Substation 09/2016 Developer Complete all functional tests for CTOAF/SUF (115kV ▇▇▇▇▇▇ Substation) 09/2016 Developer Issue CTOAF/SUF (115kV ▇▇▇▇▇▇ Substation) as-built (red line) drawings and Turnover Packages (TOPs) for CTO review and approval 11/2016 Developer Transfer care, custody, and control of CTOAF/ SUF (115kV ▇▇▇▇▇▇ substation) to CTO 10/2016 Developer Cut in outage for SUF (115kV Line) 09/2016 Developer In-Service Date (Developer receives Backfeed Power From Connecting Transmission Owner) 09/2016 Developer Complete all 35kV functional tests and Verifications of DAF (35kV JR Station) 10/2016 Developer Start energizing Collection System Circuits and start Developer Turbine testing (initial power to NYPA); Initial Synchronization Date 10/2016 Developer Complete Wind Turbine Commissioning 11/2016 Developer Commercial Operation Date 11/2016 Developer SUF and CTOAF Project close out. Complete and submit all required Documentation (CTOAF/SUF Record Drawings, Punch List Items, Final Turnover Packages), including remaining Record DAF drawings 11/2016 Developer DAF Project close out completed (including punch list items) 10/2016 Developer CTOAF/SASUF (115kV ▇▇▇▇▇▇ Station) Property Transfer N/A Developer The following notes apply to all work performed as required by this Agreement or the NYISO OATT by Connecting Transmission on SUFs and CTOAFs:
Issue For Construction relay settings, relay setting basis documents and relay logic drawings are on site. n site (relay manuals, ▇▇▇▇ procedures, IEEE/ANSI, vendor, etc.) DocuSign Envelope ID: C016B880-6F7F-443F-A1CF-3242CE7A3355 DocuSign Envelope ID: 772B9099-F223-4D95-9E54-D9DF081F820C • Ensure that the Project Safety Plan has been prepared, approved by OWNER and is available on- site. • Conduct kickoff meeting with OWNER. • Coordinate installation of IFC relay and integration settings by the SP&C 3-7 ENGINEER. • Ensure COMMISSIONING TEAM personnel are scheduled for the duration of the PROJECT. • Perform an initial safety risk assessment of the site prior to start of commissioning.
Examples of Issue For Construction in a sentence
The City will initiate this development requirement once the Project issues complete permitted 100% Issue For Construction plans or receives a funding commitment through the FTA.
Waggoner Title: Head of Department of Pathobiology Title: Chief Executive Officer Date: Date: 23 August 2014 By: Name: ▇▇▇▇ Doblhoff-▇▇▇▇ Title: Vice-▇▇▇▇▇▇ for Research and International Affairs Date: Principal Investigators acknowledge that they have read this Agreement in its entirety and will use reasonable efforts to uphold their obligations and responsibilities set forth in this Agreement: Signature: /s/ ▇▇▇▇▇▇ ▇.