Examples of Isolation barrier in a sentence
Isolation barrier partitions shall be constructed of wood or metal framing in all openings larger than thirty-two (32) square feet, except that where any one dimension is one foot or less, framing is not required.
Isolation barrier membrane: Self-adhering, high-temperature sheet, minimum 15 mils thick, consisting of cross-laminated polyethylene-film top surface laminated to layer of butyl adhesive, with release-liner backing; cold applied, in roll width to match or exceed width of area to be protected.
The Governor should remind staff of the need for observations of at-risk prisoners to be carried out at irregular intervals, in keeping with the provisions of paragraph 4 of Annex 8HH in PSO 2700 and of paragraph9.23 of his local suicide prevention policy document.
The filing of all required notifications and variances, including the payment of all fees charged by all regulatory agencies.b. Work area protection.c. General protection.d. Isolation barrier construction.
System should be designed that ID owners never need to hand over their device to a verifier.• Unlinkable Presentations.
Amanda is currently Assistant Financial Services Manager at Newcastle upon Tyne Hospitals NHS Foundation Trust.Sally Wilson had raised the issue of whether it was necessary to rearrange the meeting scheduled for 24 May due to the demands of the 2017/18 annual accounts timetable on members’ workloads; the timetable requires trusts and foundation trusts to submit their audited accounts by noon on Tuesday 29 May.
Subject to the license terms in their Authorized Provider Agreement or Licensed Training Provider Agreement, the terms in this document, and additional terms provided by Red Cross in association with the download of approved Training Provider graphics (collectively, the “Terms”), Training Providers may obtain downloadable files with approved Training Provider graphics.
Hand washing facilities in all patient care areas are accessible to health care providers.b. Compliance with proper hand washing is monitored regularly.c. Isolation/ barrier nursing facilities are available.d. Adequate gloves, masks, soaps, and disinfectants are available and used correctly.
Isolation barrier removal requires a whole- program analysis, which restricts the use of dynamic class loading and reflection.
Sensor arrangementIn ITER, the primary measurements are provided by magnetic coils and the steady-state sensors provide onlySensors sidest1 channel nd2 channel Current spinning MixersCubicle side Isolation barrier Surge voltage rating 4000 Vpk Isolatedpower supplysupplementary contributions for the magnetic measure- ments [2].