Pursuant to that same agreement, Entergy will submit to NYSDOS a new consistency certification for renewal of the IP2 and IP3 operating licenses on or before January 31, 2017.
After moving through the condensers, cooling water from IP2 and IP3 flows downward from the discharge water boxes via six 96-inch diameter down pipes and exits beneath the water surface in a 40-foot wide discharge canal.
Entergy agrees to conduct a general visual inspection of the steam generator channel head and the tubesheet region for evidence of cracking at IP2 and IP3 during the IP3 2017 and the IP2 2018 refueling outages.
Power is delivered to the ConEdison transmission grid via two double-circuit 345-kV lines that connect the IP2 and IP3 main transformers to the ▇▇▇▇▇▇▇▇ substation located across Broadway near the main entrance to IPEC.
Pursuant to an agreement between Entergy and NYSDOS, among other parties, dated January 9, 2017, regarding the planned cessation of operation of IP2 and IP3, NYSDOS hereby withdraws its challenge to Entergy’s November 5, 2014 withdrawal of its consistency certification, and will proceed as if the withdrawal became effective on November 5, 2014, thereby (1) rendering NYSDOS’s November 6, 2015 objection moot and of no effect and (2) requiring Entergy to submit a new certification.
Entergy will transfer a minimum of 4 casks (total) with a capacity of 32 bundles each of IP2 and IP3 spent fuel to dry storage per year, and will transfer a total of 24 such casks by the end of 2021.
Entergy will inspect for, find and remove or assess the safety consequences of any loose parts present on a cycle-to-cycle basis starting with the 2018 IP2 inspections.
Entergy certifies to the NRC and the New York Department of State (“NYSDOS”) that the proposed renewal of the IP2 and IP3 Operating Licenses complies with the enforceable policies of the New York State Coastal Management Program (“NYSCMP”) and that continued operation of IPEC will be conducted in a manner consistent with the NYSCMP.
Entergy expects IP2 and IP3 operations during the period of extended operation (“PEO”) to be a continuation of current operations as described below, with no physical or operational station alterations that would affect New York State’s coastal zone.
They have been admitted as intervenor parties and have raised procedural and substantive objections in the NRC Proceedings to the relicensing of IP2 and IP3.