Inter-connection point / Delivery point / Metering point definition
Inter-connection point / Delivery point / Metering point means the point at 33kV or above where the power from the Solar Power Project is injected into the Pooling Substation at the Solar Park or STU / CTU substation as applicable. The Metering shall be done at this interconnection point where the power is injected into the Pooling Substation at the Solar Park or STU / CTU system i.e. Delivery Point. For interconnection with grid and metering, the developers shall abide by the relevant CERC Regulations, Grid Code, and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.
Inter-connection point / Delivery point / Metering point means the 220KV or above of ISTS Grid Substation (GSS), where the power from the wind power Projects are injected into the ISTS substation (including the dedicated transmission line connecting the wind power Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.
Inter-connection point / Delivery point / Metering point means the point at 33kV or above where the power from the Solar Power Project is injected into the Pooling Substation at the Solar Park or STU / CTU substation as applicable. The Metering shall be done at this interconnection point where the power is injected into the Pooling Substation at the Solar Park or STU / CTU system i.e. Delivery Point. For interconnection with grid and metering, the developers shall abide by the relevant CERC Regulations, Grid Code, and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time. “Inter-connection point /Delivery/Metering point” will be at the ISTS System, i.e. 400 kV Substation where ISTS System is involved. The Interconnection Point / Delivery Point /Metering Point shall be on the LV side of the 400 kV substation and all costs and losses up to that point will be on account of the solar project developers. The solar park where internal transmission system is connected to the STU system, its Interconnection Point /Delivery Point /Metering Point will be at the STU system.