Integrated Control System definition
Examples of Integrated Control System in a sentence
Morbark Integrated Control System (MICS) is the ultimate diagnostic system that monitors hydraulic pressures, temperatures, clutch systems, and engine efficiency to maximize performance.
This clause shall apply to the Integrated Control System (ICS) and other protection and telemetry equipment using computers, microprocessors and software specifically developed or designed for the Works or to integrate with manufacturers standard equipment forming part of the Works and not being a component part of manufacturers standard equipment.
Contractor shall provide new Getac Fully Rugged Laptops, tablets, and Integrated Control System Displays and related Accessories to County as listed below for all Line Numbers “exactly” as specified Section III of this Attachment A.
County’s Board of Supervisors has authorized the Purchasing Agent or his designee to enter into a Contract for the purchase of Getac Fully Rugged Laptops, tablets, and Integrated Control System Displays and related Accessories.
The Parties hereto have executed this Contract # MA-060-15011899 for the purchase Getac Fully Rugged Laptops, tablets, and Integrated Control System Displays and related Accessories on the dates shown opposite their respective signatures below Contractor*: CDCE Inc.
Provide analyses required to establish perfor=.ance and functional design criteria for reactor control pressurizer and pressurizer control, steas generator control, custooer feedwater and steam ' ! systems and Integrated Control System.
The main intent of the Integrated Control System (ICS) is to eliminate all foreign platforms (hardware and software) as far as practically possible.
Expanding and consolidating the interface definitions for the facility element including descrip- tion of the interfaces with ESS Site Infrastructure / buildings and ESS Integrated Control System (ICS) (e.g. clearance for stations, access, power, storage, pre-assembly areas, data format and rate, signals).
On the Closing Date Parent, the Representative and the Company shall enter into an escrow agreement with the Escrow Agent effective as of the Closing Date which shall be substantially in the form attached hereto as Exhibit 3.4 (the “Escrow Agreement”), and Parent shall deliver the Adjustment Holdback Amount to the Escrow Agent which shall be held by the Escrow Agent pursuant to the Escrow Agreement.
In general, centralized plant control utilizing Integrated Control System (ICS) from a Central Control Room (CCR) is required along with Satellite Instrument Shelters (SISs) located at convenient places in close proximity to the plant to house all instrument racks/panels, etc.