Incomplete Roads definition
Examples of Incomplete Roads in a sentence
The Owner will be responsible for the costs of the video inspections, the final video of the sewer lines underlying each of the Incomplete Roads, and any additional correctional items resulting from the Incomplete Roads.
Before any Incomplete Roads are used without the final layer of asphalt, the Owner will ensure that the streets or roadways are properly striped.
The Owner will ensure that Incomplete Roads comply with all Governing Requirements, including but not limited to compliance with federal, state and local laws involving accessibility.
As part of the final inspection of each of the Incomplete Roads, the Owner shall arrange for the video or television inspection of the sewer lines that underlie the completed roadway, provide a copy of the video or television report to the City, and report the results of such inspection to the City.
Before the final lift of asphalt is placed on each of the Incomplete Roads, concrete rings around valve and manhole lids will be repaired as needed by the Owner.
The Owner will also install concrete rings around survey monuments, valves and manhole lids in compliance with the Governing Requirements before each of the Incomplete Roads is used.
After the placement of the final lift of asphalt on each of the Incomplete Roads, the Owner will install final striping and adjust survey monuments, valves and manhole lids in compliance with the Governing Requirements.
The Owner will be responsible for replacing any subgrade, asphalt or concrete on the Incomplete Roads and completing any final inspection or punch list items, as required by the City.
Subject to the conditions in this Section, an Owner may construct and use certain street and roadway improvements on the Property before the final lift of asphalt has been placed (“Incomplete Roads”) subject to the following conditions: The Owner will complete all other Components of the Incomplete Roads, including, without limitation, the subgrade, concrete (e.g., curb and gutter, sidewalks, driveway entrances) and first lift of asphalt.
With respect to each of the Incomplete Roads, the Owner will also demonstrate, to the satisfaction of the City Engineer, and before the commencement of construction of any Incomplete Road, that storm water on and around the proposed Incomplete Road will be accommodated by existing drainage facilities, and will not pond on the proposed Incomplete Road.