Examples of Improperly in a sentence
Notice of Incomplete or Improperly Submitted ClaimIf an urgent care claim is incomplete or was not properly submitted, The Plan will notify the Member about the incomplete or improper submission no later than 24 hours from The Plan’s receipt of the claim.
Notice of Improperly Submitted ClaimIf a pre-service claim request was not properly submitted, The Plan will notify the Member about the improper submission as soon as practicable, but no later than 3 days after The Plan’s receipt of the claim and will advise the Member of the proper procedures to be followed for filing a pre-service claim.2. Urgent Care Claim Determination and Noticea.
Improperly disclosing or personally using confidential information obtained through your job is prohibited.
Improperly designed and installed BMPs result in excess sediment, which impairs surface waters, adversely affect beneficial uses, and results in exceedance of water quality objectives in the Basin Plan, including for sediment.
Improperly designed and installed BMPs result in excess sediment, which impairs surface waters, adversely affect beneficial uses, and results in exceedance of water quality objectives in the Basin Plan, including for sediment and turbidity.
Improperly interfering with an investigation or inspection authorized by statute, or with any disciplinary proceeding.
Notice of Improperly Submitted ClaimIf a pre-service claim request was not properly submitted, The Plan will notify the Member about the improper submission as soon as practicable, but no later than 5 days after The Plan’s receipt of the claim, and will advise the Member of the proper procedures to be followed for filing a pre-service claim.2. Urgent Care Claim Determination and Noticea.
If verbal notice is provided, The Plan will provide a written notice within 3 days after the date The Plan notified the Member.c. Notice of Incomplete or Improperly Submitted ClaimIf an urgent care claim is incomplete or was not properly submitted, The Plan will notify the Member about the incomplete or improper submission no later than 24 hours from The Plan’s receipt of the claim.
Improperly Timed Work: Perform all cutting and patching required to install improperly timed work, to remove samples of installed materials for testing, and to provide for alteration of existing facilities or for the installation of new Work in the existing construction.
Improperly installed wireless equipment can cause serious injury when air bags inflate rapidly.