Illustrative definition

Illustrative building elevation means illustrations drawn to accurately portray the appearance of the building after construction. Building elevations shall show all sides of the proposed building and/or addition and the size and spacing of windows and doors, light fixtures, towers, chimneys, and roof mounted equipment and the roof itself. The elevations shall show the height of buildings and structures and the typical materials to be used (materials shall be indicated on each street). There shall be consistency between the elevation and floor plans submitted (eg. the windows and/or doors in locations). If the proposal is an addition or a remodel, then the building shall delineate the where or what existing elevation looks like and where the new construction will occur.
Illustrative building elevations means drawn with shadows to give depth with people, cars, or trees for scale.

Examples of Illustrative in a sentence

  • Schematic of LAUSD’s Competitive Contracting Process (Illustrative Only) Cone of Silence 1.

  • Natural persons covered by 11 Illustrative list of "creative arts": the creative arts, including ngä toi Mäori (Mäori arts), comprise a range of art forms and disciplines including: dance, music, theatre, haka, waiata and other performing arts; visual arts, such as painting, sculpture, craft arts, whakairo (carving), raranga (weaving), tä moko; literature; film and video; language arts and new media.

  • Illustrative examples of the application of the foregoing Allocated Share adjustments using hypothetical numbers are included as Example 3 and Example 4 in Appendix A to Schedule II.

  • Illustrative examples of the application of the foregoing Allocated Share adjustments using hypothetical numbers are included as Example 3 and Example 4 in Appendix A to Schedule III.

  • Illustrative concept plans for Infrastructure shall be submitted for both transportation systems and utilities within that Major Phase and shall correspond to any Improvements to be provided with the applicable transfer map or vesting tentative transfer map.

  • TIMING OF CALCULATIONS Illustrative values for Tables 1, 2 and 3 will be provided 14 days prior to the Illinois Auction.

  • Illustrative values for Tables 1, 2 and 3 will be provided 14 days prior to the Illinois Auction.

  • Table 3—Chemical Analytical Results for Illustrative Example, Phase 3 Day 105[C]SHW, M 105[C]W, M ASHW370 105 [PNAP], M 0 ......................................................................................

  • Illustrative Example: Actual Pay Processing Date: August 2, 2019 Schedule Pay Processing Date: July 25, 2019 Equals: Eight Days Late Multiplied by: Twenty dollars ($20) per day Equals: Late Payment Penalty of one-hundred sixty dollars ($160) Late fees can only match, not exceed the overall gross payment that is delayed.

  • Illustrative Example: • Continuing the example given in paragraph 2.a, if Attorneys have a 20% contingency fee contract with City C for the relevant litigation, the amount calculated in this step would be 20% of $1,100,000, or $220,000.