IFC Set definition

IFC Set means, with respect to a given Facility and its Site, an issued for construction drawing set, including some or all of the following, as applicable: Cover sheet, Work site plan (work site and general arrangement drawings), Grading and drainage plan, Soil erosion and sediment control, Foundation plans and details, Structural plans, details and elevation, Battery Layout, Single-line electrical diagrams, Electrical schematic diagrams, Functional Description of Operation and Control of the Facility (for energy storage and/or micro grid only), Network Architecture Drawings, Power and control wiring, Grounding plans, Lightning and surge protection drawings, Wiring Diagrams, Bloom Equipment Specifications, Electrical schematic diagrams, Battery Enclosure Drawings and, I/O list.
IFC Set shall have the meaning set forth in Section 3.1.11 of the Scope of Work.

Examples of IFC Set in a sentence

  • The IFC Set shall represent the further progression of the approved Permit Set together with any value engineering strategies approved by the Department.

  • The IFC Set shall be progressed to One Hundred Percent (100%) completion of those required in a traditional Design/Bid/Build delivery method.

  • The IFC Set should be progressed to One Hundred Percent (100%) completion of those required in a traditional Design/Bid/Build delivery method.

  • This amount includes Title I pre-design services; Design Development Drawings; a Permit Set of construction documents; and 100% construction documents (IFC Set); as well as Title II Construction Administration Services (altogether, the “Design Fee”).

  • The GMP as amended after issuance of the IFC Set (if applicable) shall include costs reasonably inferable from the Contract Documents as established by the IFC Set.

  • In this submittal, Contractor shall highlight any aspect of the design in the IFC Set that represents a material deviation from the IFC Set documents and shall address in a narrative format the impact, if any, such departure shall have on the Project’s aesthetics, functionality or performance.

  • During the Construction Implementation Stage, Contractor shall construct the Project in accordance with the IFC Set, the approvals provided by the Code Officials, the Contract Documents, and all applicable codes and ordinances.

  • If unforeseen circumstances beyond the control of Contractor or changes required by the City make it necessary to amend any of the approved IFC Set documents, Contractor shall prepare an amendment to the IFC Set and shall submit such amendment to the Project Manager for review and, if acceptable to the Project Manager, the Project Manager shall provide approval in writing.

  • Owner and CM/GC may amend any GMP to include changes set forth in the IFC Set.

  • After receipt of any notice required under this Section, Owner and CM/GC shall meet to discuss the changes in the IFC Set.