Hydropower Project definition

Hydropower Project means either: (a) a new hydropower facility, including impoundment facilities, diversion facilities, and pumped storage facilities that use the flow of water to generate electricity or storage, at an existing dam; or (b) a project that involves construction, repair, maintenance, or significant expansion of turbines at an existing hydropower facility, including impoundment facilities, diversion facilities, and pumped storage facilities that use the flow of water to generate electricity or storage, located at an existing dam or of an existing hydropower dam (a “Modernized or Retooled Hydropower Project”).
Hydropower Project means the hydropower station project located in Jiulongshan, legally owned and operated by the Object Company.
Hydropower Project means the hydropower project located in Qingtian Wuliting, legally owned and operated by the Object Company.

Examples of Hydropower Project in a sentence

  • If the Date of First Operation of the Project as recorded by PJM-EIS GATS or M-RETS (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled) occurred prior to the date that is thirty (30) days of the Commission Bid Approval Date, then the Mid-Year MES Confirmation shall not be required.

  • A Modernized and Retooled Hydropower Project must demonstrate that as a result of the Modernized or Retooled activities the annual Actual Production from the Project has increased by at least 30%.

  • For avoidance of doubt, no verification of this requirement is expected to be performed by the IPA subsequent to the initial verification following the Date of First Operation (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled).

  • If Seller has committed to fulfill a higher requirement than the Minimum Equity Standard for the Project under the RFP, Seller shall provide to Buyer and the IPA information and documents sufficient to verify the fulfillment of such attributes within thirty (30) days of the Date of First Operation (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled).

  • If the Date of First Operation of the Project as recorded by PJM-EIS GATS or M-RETS (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled) occurred prior to December 15, 2022, then the Minimum Equity Standard shall not apply.

  • Such documentation and verification must be provided to the IPA within the later of: five (5) Business Days of the Effective Date of this Agreement or within five (5) Business Days of: the Date of First Operation of the Project (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled).

  • Such information and documents shall be provided within thirty (30) days of the Date of First Operation (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled).

  • Further, if construction of the Project spans multiple delivery years, then fulfillment of this commitment shall be measured for the entirety of the period for which Construction Activities occurred up through the Date of First Operation (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled) and not for each delivery year separately.

  • Notwithstanding the foregoing, if the Date of First Operation of the Project as recorded by PJM-EIS GATS or M-RETS (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled) occurred prior to the date that is thirty (30) days of the Commission Bid Approval Date, then the MES Compliance Plan shall not be required.

  • If the Date of First Operation of the Project as recorded by PJM-EIS GATS or M-RETS (or the Hydropower Refurbishment Completion Date if the Project is a Hydropower Project that is newly Modernized or Retooled) occurred prior to the date that is thirty (30) days of the Commission Bid Approval Date, then the MES Report shall be submitted as soon as practicable on or around the date that is thirty (30) days after the Commission Bid Approval Date.


More Definitions of Hydropower Project

Hydropower Project means a facility that would utilize for the generation of electricity a natural water feature, such as a natural lake, tidal power, waterfall, the gradient of a natural stream, a dam, or impoundment;
Hydropower Project means any development which uses a flow of wa- ter as a source of electrical or mechanical power, or which regulates the flow of water for the purpose of generating electrical or mechanical power. A hydropower project development includes all powerhouses, dams, water con- duits, transmission lines, water impoundments, roads, and other appurtenant works and structures.

Related to Hydropower Project

  • Power Project or “Project” shall mean the Wind Power generation facility of Contracted Capacity of ………..[Insert capacity] MW, located at [Insert name of the place] in …. [Insert name of the District and State] having a separate control system, metering and a single point of injection into the grid at Delivery/Interconnection/Metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;

  • Power Plant means a facility for the generation of

  • Small scale hydropower facility means a facility located within

  • Infrastructure project means any activity related to the construction, alteration, maintenance, or repair of infrastructure in the United States regardless of whether infrastructure is the primary purpose of the project. See also paragraphs (c) and (d) of 2 CFR 184.4.

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.