Heave definition

Heave means upward movement of the ground beneath the Buildings as a result of the soil expanding.
Heave means any rise in the surface of a road cut in relation to the grade of the adjacent undisturbed highway;
Heave is defined as the swelling of the soils resulting in differential uplift of the structure. “Tilt” is defined as uniform deflection front to back, back to front or side to side. “Horizontal movement” may be caused by soil erosion, creep and/or slough of the soils. These conditions may be caused by excess moisture from plumbing leaks, poor drainage (surface and subsurface), flooding, rising water table, trees or their removal, or other causes. Maintaining proper drainage, plumbing and landscaping is the responsibility of the owner. All costs and/or responsibility for redecorating, repairing or replacing of any materials or items not specified in the Scope of Work per the Agreement. Including but not limited to; sheetrock, wall plaster, tile, wooden members, roof or other rigid materials and these items are not covered. Any work done by another party in any area of the foundation or structure previously piered without prior written approval by Contractor Slab Only - Owner fails to have Licensed Plumber perform leak tests within thirty (30) days, AND/OR repair any known plumbing leak

Examples of Heave in a sentence

  • Within 30 days 16 Heave h = positive vertical displacement from normal profile.

  • Excess The first amount you will have to pay towards each separate claim Geographical Limits The country where your Home is situated as stated in the Schedule Heave Expansion or swelling of the land beneath the buildings resulting in upwards movement.

  • Heave Heave or upward movement of the foundation due to soil expansion is excluded.

  • The Frequency Transfer Function can be calculated for both the vertical BOUNCE or the PITCH mode allowing the User to optimize either Heave or Pitch behaviour of the vehicle or finding the best compromise for both.

  • At 0 Hz this function starts at 1 and typically shows "peaks" near the Natural (Heave and Pitch) Frequencies of Sprung and Unsprung masses.

  • Heave Equipment Procurement Program Bid 24-05-0713, together with any exhibits and amendments issued or applicable thereto (collectively, “Contract Documents” or “Contract”).

  • Weight plates - Heave plate allows for bolting enough weight plates so that the buoy k▇▇▇▇ in proper orientation during horizontal towing.

  • Within 30 days 5 h > 100 mm 16 Heave h = positive vertical displacement from normal profile.

  • Heave data, developed in the heave processor, are distributed along with attitude data.

  • Roll 45.6 sec Pitch 37.4 sec Heave 21.8 sec Drill water (lower hulls) 11,145 bbls Fuel oil (lower hulls) 20,968 bbls Lube oil 271 bbls Potable water 7,309 bbls Liquid mud (total) 7,796 bbls Base oil stowage (lower hulls) 2,808 bbls Brine stowage (lower hulls) 2,808 bbls Bulk mud and cement stowage 25,138 cu.ft.


More Definitions of Heave

Heave is defined as the swelling of the soils resulting in differential uplift of the structure. “Tilt” is defined as uniform deflection front to back, back to front or side to side. “Horizontal movement” may be caused by soil erosion, creep and/or slough of the soils. These conditions may be caused by excess moisture from plumbing leaks, poor drainage (surface and subsurface), flooding, rising water table, trees or their removal, or other causes. Maintaining proper drainage, plumbing and landscaping is the responsibility of the owner. All costs and/or responsibility for redecorating, repairing or replacing of any materials or items not specified in the Scope of Work per the Agreement. Including but not limited to; sheetrock, wall plaster, tile, wooden members, roof or other rigid materials and these items are not covered. Any work done by another party in any area of the foundation or structure previously piered without prior written approval by Contractor Slab Only - Customer fails to have Licensed Plumber perform leak tests within thirty (30) days, AND/OR repair any known plumbing leak(s) within ninety (90) days of Work completion AND submit a copy of plumbing repair receipt along with final post plumbing repair static leak test to Contractor.
Heave means gradual deformation of the floor of an underground mine.

Related to Heave

  • Sinkhole means a surface depression caused by a collapse of soil or overlying formation above fractured or cavernous bedrock.

  • Flooding means a volume of water that is too great to be confined within the banks or walls of the stream, water body, or conveyance system and that overflows onto adjacent lands, thereby causing or threatening damage.

  • Washout means the carrying away of solid waste by waters of the base flood.

  • Weathertight means that in any sea conditions water will not penetrate into the vessel.

  • Subsidence means the lowering in elevation of the surface of land by the withdrawal of groundwater.