Ground System definition
Examples of Ground System in a sentence
The Satellite Control Software and Ground Encryptors shall be tested and the results reviewed in accordance with the program Ground System Test Plan.
The license to reproduce shall not extend to the Spacecraft, the Ground System, or material components thereof that consist of items of hardware; provided that such license shall extend to items required or appropriate only for maintenance or use of the Spacecraft or the Ground System, such as operating manuals and software, and shall permit Customer to make backup copies of such items consistent with its standard business practices.
The approach shall address its plan for: • Mission Design Toolkit (MDT) use; • Rapid bus and space vehicle AI&T Process, Facility(s), & Hardware Inventory; • Modular Flight System Software & Re-Use; • Modular, standards-based, configurable buses; • Compatibility with and support for Rapid Transport & Launch; • Compatibility with and support for ORS Compatible Ground System Architecture; • Compatibility with and support for Rapid On-Orbit Checkout, Calibration, and Handoff.
Final Acceptance of the Customer Ground System shall be contingent on the following: [*****] The Satellite Control Center shall be used to perform the compatibility testing described in section 7.1 of Exhibit B.
Contractor shall continue to operate such Spacecraft in accordance with the preceding sentence until both (i) Contractor has made Delivery of, and Customer has given its Final Acceptance of, the Ground System or Ground System Follow-on Deliverables (as applicable) and (ii) Customer notifies Contractor in writing that Customer’s personnel have been trained to operate such Spacecraft in accordance with the satellite operating procedures furnished by Contractor.
C.3.9.1 System Engineering Plan (SEP) - The Contractor shall develop and/or maintain SEPs to include technical approaches, changes and modifications to the Space Vehicle, Ground System Components, and UE specifications of system requirements (CDRL A00A).
HCG shall test the performance of the Transponder ---------- Capacity, Ground System, and Security Services in accordance with an acceptance test plan to be prepared by HCG and delivered to NRTC at least 180 days prior to the Scheduled Service Commencement Date.
The approach shall address its plan for: • Mission Design Toolkit (MDT) use; • Rapid payload and space vehicle AI&T Process, Facility(s), & Hardware Inventory; • Modular Flight System Software & Re-Use; • Modular & Open System Payloads; • Compatibility with and support for Rapid Transport & Launch; • Compatibility with & Support for ORS Compatible Ground System Architecture; • Compatibility with & Support for Rapid On-Orbit Checkout, Calibration, and Handoff.
GSFC/FP&PD, 428-ICD-EDOS/EGS, Interface Control Document (ICD) Between the Earth Observing System (EOS) Data and Operations System (EDOS) and the EOS Ground System (EGS) Elements, Revision 5, May 15, 2009.
The approach shall address its plan for: • Mission Design Toolkit (MDT) use; • Rapid bus and spacecraft AI&T Process, Facility(s), & Hardware Inventory; • Modular Flight System Software & Re-Use; • Modular, standards-based, configurable buses; • Compatibility with and support for Rapid Transport & Launch; • Compatibility with and support for ORS Compatible Ground System Architecture; • Compatibility with and support for Rapid On-Orbit Checkout, Calibration, and Handoff.