Green Pipe definition

Green Pipe means casing and tubing, other than J55 and NW 80, which has not been subjected to heat treatment.

Examples of Green Pipe in a sentence

  • Purchaser's failure to place orders of Green Pipe in an amount equal to the Annual Minimum Purchase Obligation shall not constitute a default under this Supply Agreement and Seller's only remedy for that failure will be the right to receive the penalties provided for under Section 13 and no more.

  • The actual raw material cost for each chemistry of Green Pipe will be calculated by taking the average amount of raw material in the particular chemistry of Green Pipe and multiplying that number times the unit cost for the applicable raw material.

  • On a monthly basis, the Parties will true-up any differential between the Green Pipe Price (based on estimated budgeted costs) and Green Pipe Price (based on actual costs) (as the initial Purchase Price may be based on estimated costs and not actual costs).

  • Purchaser’s failure to place orders of Green Pipe in an amount of 80,000 metric tons in a calendar year shall not constitute a default under this Supply Agreement and shall not be subject to any penalty hereunder, as Purchaser’s purchase obligations hereunder shall be solely based on individual purchase orders placed by Purchaser in its sole discretion under Section 5 herein.

  • The Production Notice will specify the metric tons only (and not the types of Green Pipe) that Purchaser is willing to purchase for the production month in question.

  • The Purchase Price for the Green Pipe will be in EURO’s and shall include European sales tax and all export taxes and duties, if applicable, to Green Pipe.

  • Upon Purchaser’s request, the Green Pipe shall be delivered to a destination port other than Houston.

  • Sanitary Sewer Service (Laterals) - Green Pipe 100mm dia., PVC DR 28, granular 'A' bedding and cover as per OPSD 1006.02, selected native material backfill including connection to main sewer, tees, expandable plug and marker post and risers where required.

  • Seller shall be committed to provide the forecasted Green Pipe needs so long as such amounts are at or below the amounts set forth in paragraph 2.1. Purchaser will use commercially reasonable efforts to provide Seller with an accurate forecast however, both Parties agree that the forecast is to be treated as an estimate only and that Purchaser’s purchase obligations hereunder shall be determined solely based on purchase orders placed by Purchaser hereunder.

  • For the purposes of this Supply Agreement, Green Pipe shall mean pipe used to manufacture drill pipe.

Related to Green Pipe

  • oil tanker means a ship constructed or adapted primarily to carry oil in bulk in its cargo spaces and includes combination carriers and any “chemical tanker” as defined in Annex II of the present Convention when it is carrying a cargo or part cargo of oil in bulk.

  • Power boiler means a boiler in which steam or other vapor is generated at a pressure of more than 15 psig for use external to itself or a boiler in which water is heated and intended for operation at pressures in excess of 160 psig and/or temperatures in excess of 250 degrees F by the direct application of energy from the combustion of fuels or from electricity, solar or nuclear energy.

  • connection pipe means a pipe, the ownership of which is vested in the Council and installed by it for the purpose of conveying water from a main to a water installation, and includes a "communication pipe" referred to in SABS Code 0252 Part I;

  • Dekatherm (dt) shall mean on million British Thermal Units and is synonymous to the term MMBTU.

  • Zone 3 means all of that part of the Lower Peninsula south of the line described in subdivision (bb).