GOGC definition
Examples of GOGC in a sentence
The Contractor shall not be responsible/liable under the paragraphs 1, 2 and 4 of this article, if defect/shortcoming/omission/loss is originated/conditioned by the qualitative inconsistency of the materials provided by the GOGC to the quality certificate issued by the manufacturer factory of materials and/or factory defect.
Except GOGC have some comments, Acceptance Certificate shall be signed within 10 (ten) days after submission.
If Contractor breaches the Contract, GOGC, consistent with article 34 is entitled to terminate the Contract and apply the Contract performance bank guarantee submitted by the Contractor as well as the advance payment bank guarantee (the latter shall be used by GOGC if as of the moment of Contract termination, the total amount of advance payment has not been fully deducted out of the amounts paid to the Contractor for performed works,).
If the Contractor fails to submit construction drawings and other technical documents to GOGC prior to signature of Acceptance Certificate on full volumes of works in accordance to the explanatory note (Annex #-), GOGC retains the right to suspend processing of the Acceptance Certificate for the full volume of Works.
Contractor shall ensure provision of works and materials with all necessary means, techniques and consumables that are necessary for carrying out tests, also issue relevant notification (not later than 48 hours before conducting test), which shall enable GOGC to be present at any kind of inspection and testing.
The contractor shall ensure fulfillment of any part of the work according to requirements of GOGC.
The contractor is imposed responsibility for all the risks, which are not GOGC risks.
Work quality shall be periodically checked by GOGC on the construction site itself or other selected territory.
The Contractor is required to notify GOGC on its readiness to commence any Work.
In the case of termination, the Contractor immediately stops activities, ensures safety of the site and within reasonable terms agreed between the Contractor and GOGC leaves the site.