GM2 definition

GM2 means [XXX].

Examples of GM2 in a sentence

  • An example of a ground training syllabus is presented in Table 1 of GM2 SPA.NVIS.130(f).

  • GM2 ARO.GEN.300(a);(b);(c) OversightVOLCANIC ASH SAFETY RISK ASSESSMENT — ADDITIONAL GUIDANCE Further guidance on the assessment of an operator’s volcanic ash safety risk assessment is given in ICAO Doc 9974 (Flight safety and volcanic ash — Risk management of flight operations with known or forecast volcanic ash contamination).

  • Kirkwood, JM, Ibrahim, JG, Lawson, DH, Atkins, MB, Agarwala, SS, Collins, K, Mascari, R, Morrissey, DM, Chapman, PB, “High-dose Interferon alfa-2b Does not Diminish Antibody Response to GM2 Vaccination, in Patients with Resected Melanoma: Results of the Multicenter ECOG Phase II Trial E2696,” Journal of Clinical Oncology, 2001; 19:1430–1436.

  • GM2 ORO.MLR.105(d)(3) Minimum equipment listPURPOSE OF THE MELThe MEL is an alleviating document having the purpose to identify the minimum equipment and conditions to operate safely an aircraft having inoperative equipment.

  • The first block of columns gives the names of the events and lists the instruments involved in each detection, as well as some relevant properties obtained assuming GR: luminosity distance DL, redshifted total mass (1 + z)M, redshifted chirp mass (1 + z) , redshifted final mass (1 + z)Mf, dimensionless final spin χf = c S˜f /(GM2), and signal-to-noise ratio SNR.

  • GM2 CAT.GEN.MPA.125 Taxiing of aeroplanesSAFETY-CRITICAL ACTIVITY (a) Taxiing should be treated as a safety-critical activity due to the risks related to the movement of the aeroplane and the potential for a catastrophic event on the ground.(b) Taxiing is a high-workload phase of flight that requires the full attention of the flight crew.

  • GM2 ARO.OPS.240 Specific approval of RNP AR APCHREFERENCES Additional guidance material for the specific approval of PBN operations, when required, can be found in ICAO Doc 9997 Performance-Based Navigation (PBN) Operational Approval Manual.

  • GM2 SPO.GEN.130 Portable electronic devices GENERAL (a) PEDs can pose a risk of interference with electronically operated aircraft systems.

  • GM2 ORO.MLR.105(d)(3) Minimum equipment listPURPOSE OF THE MEL The MEL is an alleviating document having the purpose to identify the minimum equipment and conditions to operate safely an aircraft having inoperative equipment.

  • GM2 ORO.SPO.110(a) Authorisation of high-risk commercial specialised operationsVALIDITY OF THE AUTHORISATION The operator may submit an application to its competent authority for a single event, a defined series of flights or for an unlimited duration, depending on the type of operations foreseen.

Related to GM2

  • M2 is the calendar month, expressed as a number, in which the day immediately following the last day of the Interest Period falls;

  • PM10 means particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers as measured by the applicable reference method or an equivalent method.

  • Pistol means any firearm with a barrel less than sixteen inches in length, or is designed to be held and fired by the use of a single hand.

  • M1 is the calendar month, expressed as a number, in which the first day of the Interest Period falls;

  • NZOC means the New Zealand Olympic Committee Incorporated.

  • N2 means, in respect of each Interest Period, the number of Calculation Days during such Interest Period, as determined by the Calculation Agent.

  • MVAR means megavolt ampere of reactive power.

  • NI 45-102 means National Instrument 45-102 – Resale of Securities.

  • m3 means cubic metre of gas and "10³m³" shall mean 1,000 cubic metres of gas;

  • MGD means million gallons per day. "mg/l" means milligrams per liter. "ug/l" means micrograms per liter. "ng/l" means nanograms per liter. "S.U." means standard pH unit. "kg/day" means kilograms per day.

  • Double Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in two or more distinct phases that requires the product container be shaken before use to mix the phases, producing an emulsion.

  • Y2 is the year, expressed as a number, in which the day immediately following the last day of the Interest Period falls;

  • LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • NI 51-102 means National Instrument 51-102 – Continuous Disclosure Obligations;

  • Bulkhead means an airtight structure separating the working chamber from free air or from another chamber under a lower pressure than the working pressure;

  • MI 11-102 means Multilateral Instrument 11-102 – Passport System;

  • Snow tyre means a tyre whose tread pattern, tread compound or structure is primarily designed to achieve in snow conditions a performance better than that of a normal tyre with regard to its ability to initiate or maintain vehicle motion."

  • GAC10 means granular activated carbon filter beds with an empty-bed contact time of 10 minutes based on average daily flow and a carbon reactivation frequency of every 180 days, except that the reactivation frequency for GAC10 used as a best available technology for compliance with MCLs under subsection 9.2.1.2 shall be 120 days.

  • NI 81-102 means National Instrument 81-102 – Investment Funds.

  • Study Centre means a centre established and maintained or recognized by the University for the purpose of advising, counselling or for rendering any other assistance required by the students in the context of distance education;

  • SOQ means Statement of Qualifications.

  • PM2.5 means particulate matter with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers as measured by a reference method based on 40 CFR Part 50 Appendix L and designated in accordance with 40 CFR Part 53 or by an equivalent method designated in accordance with 40 CFR Part 53.

  • Opaque means impenetrable to sight.

  • Hydrozone means a portion of the landscaped area having plants with similar water needs. A hydrozone may be irrigated or non-irrigated.

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Zone 3 means all of that part of the Lower Peninsula south of the line described in subdivision (bb).