Fully Burdened Manufacturing Cost means, with respect to any Licensed Product supplied by or on behalf of NVCR to Zai hereunder if such Licensed Product (or any precursor or intermediate thereof) is manufactured by a Third Party manufacturer [***].
FTE Cost means, for any period, the FTE Rate multiplied by the number of FTEs in such period.
Fully Loaded Cost means the direct cost of good or service plus all applicable indirect charges and overheads.
Development Cost means the total of all costs incurred in the completion of a Development excluding Developer Fee, operating deficit reserves, and total land cost as typically shown in the Development Cost line item on the development cost pro forma.
COGS means the cost of goods sold as determined in accordance with U.S.GAAP;
Maximum medical improvement means that no further material improvement would reasonably be expected from medical treatment or the passage of time;
Development Costs means costs incurred to obtain access to reserves and to provide facilities for extracting, treating, gathering and storing the oil and gas from reserves. More specifically, development costs, including applicable operating costs of support equipment and facilities and other costs of development activities, are costs incurred to:
fruitless and wasteful expenditure means expenditure that was made in vain and would have been avoided had reasonable care been exercised;
Development Expenses means, with respect to SAIL Developments as well as HOME Developments when the HOME Development is also at least partially financed with a MMRB Loan (as defined in rule Chapter 67-21, F.A.C.), usual and customary operating and financial costs, such as the compliance monitoring fee, the financial monitoring fee, replacement reserves, the servicing fee and the debt service reserves. As it relates to SAIL Developments as well as HOME Developments when the HOME Development is also at least partially financed with a MMRB Loan (as defined in rule Chapter 67-21, F.A.C.) and to the application of Development Cash Flow described in subsections 67-48.010(5) and (6), F.A.C., as it relates to SAIL Developments or in paragraph 67-48.020(3)(b), F.A.C., as it relates to HOME Developments, the term includes only those expenses disclosed in the operating pro forma on an annual basis included in the final credit underwriting report, as approved by the Board, and maximum of 20 percent Developer Fee per year.
Additional Transportation Cost means the actual cost incurred for one-way Economy Transportation by Common Carrier reduced by the value of an unused travel ticket.
FTE Costs means, for any period, the FTE Rate multiplied by the number of FTEs in such period.
LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
Developed exclusively at private expense means development was accomplished entirely with costs charged to indirect cost pools, costs not allocated to a government contract, or any combination thereof.
Cluster development means a contiguous cluster or
LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
LCC-300 Cost Centre G Terminus Building : E&M Works Lump Sum Breakdown G4 : Plumbing and Drainage Lump Sum Item LSG4.4 G4.4 : Cold Water Installation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum *** *** *** ------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG4.4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
Project Scope means the description or activity of work to be accomplished on the project.
LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]
Cost-plus-a-percentage-of-cost contract means a contract under which the contractor is paid a percentage of the total actual expenses or costs in addition to the contractor's actual expenses or costs.
Commercialization Costs means the out-of-pocket costs and expenses incurred by Adapt or its Affiliates directly attributable to, or reasonably allocable to, the Commercialization of a Product. Commercialization Costs for a Product shall include, preparation of promotional, advertising, communication, medical, and educational materials relating to the Product and other Product literature and selling materials, activities directed to marketing of the Product, including purchase of market data, development and conduct of market research, advertising, public relations, public affairs and other communications with Third Parties regarding the Product; development and conduct of sales force training (including materials, programs and travel to and attendance at training programs) for medical representatives responsible for promoting the Product; and development and maintenance of sales bulletins, call reporting and other monitoring/tracking, sales force targeting, validation and alignment programs and documentation.
Cost of Goods Sold means [***].
Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected. Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.
Baseline Personnel Security Standard means the pre-employment controls for all civil servants, members of the Armed Forces, temporary staff and government contractors generally.
Public improvement costs means the costs of:
Assigned Annual Special Tax means the Special Tax of that name described in Section D.
Project means the goods or Services described in the Signature Document or a Work Order of this Contract.