The Authority resolved to Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) in the State of Assam under JICA - ODA loan assistance.
The Authority resolved to Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the State of Assam under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.3 km) on Engineering, Procurement, Construction (“EPC”) basis in accordance with the terms and conditions to be set forth in an agreement to be entered into.
Contract AgreementPage 16 of 153 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA - ODA loan assistance.” Mar 2022 B.
All materials, works and construction operations shall confirm to the Four Lane Manual (IRC:SP:84–2019) of Specifications and Standards for Four Laning (IRC:SP: 84–2019), referred as the Two Lane Manual (IRC:SP: 84–2019), and MORTH Specifications for Road and Bridge Works, IRC: SP: 48-1998 and IRC 56- 2011.
Contract AgreementPage 15 of 152 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH- 37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near ▇▇▇▇▇▇▇▇▇ Pt.-I Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.8 km)” (3rd Call) Mar 2023 B.
The signing of the memorandum, in three (3) counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall be deemed to constitute a valid evidence of giving the relevant Right of Way to Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode the Contractor.
For the avoidance of doubt, in case the cost as determined by the Contractor and the Authority reveals a difference of more than 10% (ten per cent), the cost as determined by the Authority shall be considered as final and binding Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode on the Contractor.
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode If appropriate and required by the Employer, the Contractor shall then appoint (or cause to be appointed) a suitable replacement person.
All materials, works and construction operations shall confirm to the Four Lane Manual (IRC: SP:84–2019) of Specifications and Standards for Four Laning (IRC: SP: 84–2019), referred as the Two-Lane Manual (IRC: SP: 84–2019), and MORTH Specifications for Road and Bridge Works, IRC: SP: 48-1998 and IRC 56-2011.
Also the Contractor shall provide Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 131+500 to Km 146+250 (Design Chainage 131+152 to 145+712) of Manja – Dillai Section (Package-7) of NH 29 in the state of Assam on EPC mode licenced copy of software used to develop Works Programme to the Authority and Authority’s Engineer.