FMPP definition
Examples of FMPP in a sentence
This requirement is provided in the FMPP Guidelines, which are published at AMS’ Marketing Services Branch Web site at: http:// ▇▇▇.▇▇▇.▇▇▇▇.▇▇▇/▇▇▇▇.
The 2008 Farm Bill increases funding for grants under FMPP, allocating mandatory funds from the Commodity Credit Corporation, from 2009 through 2012 with $5 million for each of FY 2009 through 2010, and $10 million for each of FY 2011 and 2012.
Each such Ancillary Service shall at OUC's option be provided by OUC either directly or through the FMPP and charged to LAKE WORTH on a direct cost pass- through basis (the “Ancillary Services Charge").
The Operational Planning Analysis will be based on the daily Florida Municipal Power Pool (“FMPP”) and/or Florida Energy Marketing (“FEM”) documentation that details projected load levels and associated dispatch conditions for the relevant study area, under the assumption that Lake Worth Beach will remain within the FMPP BA.
If the Ancillary Service is being provided through the FMPP, the costs to be passed through shall be calculated in a manner consistent with the allocation methodology used by the FMPP, which method is, as of the date of this Agreement, based on the pro rata energy share that the Ancillary Services required to serve LAKE WORTH under this Agreement bears to OUC's total cost of Ancillary Services during the applicable billing period.
District, (“Lessee”), has leased a building, the ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ Early Childhood Development Center, located at ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇, Las Vegas, NV 89101, in the City of Las Vegas, consisting of one floor and approximately 10,181 square feet from ▇▇▇▇▇ County Community Resources Management, (“Lessor”).
FMPA and LWB shall develop mutually agreeable operating procedures that detail the scheduling of Exchange Energy, which shall address, without limitation, energy true-ups for differences between LWB’s Solar Energy and the Exchange Energy, accounting for difference in price between LWB Solar III Energy and Exchange Energy, changed circumstances in the event LWB is no longer part of the FMPP Balancing Authority, and other scheduling, transmission, balancing, or cost issues.
Any criteria violations, exceedances relative to system operating limits, or other drivers for mitigations will be identified, which may require significant coordination within a multi-party configuration involving Lake Worth Beach, FPL, FMPP, the FRCC RC, or other impacted systems, which FMPA will lead with support from a designated Lake Worth Beach transmission system operations coordinator who is empowered to make critical operational decisions as may be required from time to time on a day-ahead basis2.
The Customer will report closure of WO after execution to FMPP team.
FMPP (facility management power & planning) will be responsible to issue WO to accommodate network expansions.