Flooring Work definition

Flooring Work. Vitrified tiles size 2’x2’ flooring in all rooms and ceramic tiles in bathrooms for floors & dodo.
Flooring Work. Premium Vitrified tiles in all bed rooms, marble in living &dining area and anti-skit tiles in terrace & toilet. Doors : Doors with wooden frame and flush shutter doors, Superior quality S.S. finish hardware fittings. Windows : UPVC windows.
Flooring Work. Vitrified tiles size 2’x2’ flooring in all rooms and ceramic tiles in bathrooms for floors & dodo. Toilet: Designer tiles up to 7' door height matching, sanitary chrome plated fitting. Doors : Flush doors with Dewas section, aluminium hardware fitting. Windows : Powder coated three track aluminium window with mosquito net & ms Grill Electicfication : Modular electrical switches Wiring : Concealed fire retardant copper wiring with security through MCB's External Painting : External walls painted with weather coated burger brand/equivalent. Internal Painting : All internal wall including roof shall be painted by acrylic washable distemper Plumbing & Sanitation : Sanitary xxxx for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen : granite platform with steel sink, glazed tiles up to 2' ft heights above platform. SCHEDULE “E” AMENITIES & FACILITIES (WHICH ARE PART OF THE PROJECT) Earthquake Resistant Structure Club House Landscaped Garden Children play Area Secured Campus Wide Roads Adequate Water Supply FOR EWS & LIG ANNEXURE ‘A’ [See rule 9] AGREEMENT FOR SALE This Agreement for Sale (“Agreement”) executed on this (Date) day of (Month), 20 , By and Between M/s Ultimate Realty, a partnership firm, having its principal place of business at X-0/00, Xxxxxxxx Xxxxx, Xxxxx Xxxxxx, Xxxxxx (X.X.), (XXX XXXXX0000X), represented by its authorized Partners; Shri Xxxxx Xxxxxxx S/o Shri V.P.S. Chauhan and 2. Shri Xxxxxxxxx Xxxxxxxxxxx S/o Late Shri B.R. Xxxxxxxxxxx (Aadhar no. 000000000000 & 000000000000 respectively), hereinafter referred to as the “PROMOTER” (which expression shall unless repugnant to the context or meaning thereof be deemed to mean and include the survivor or survivors of him and his heirs, executors and administrators and his assigns). Mr. / Ms. , (Aadhar no. ) son / daughter of , aged about , residing at , (PAN ), hereinafter called the “Allottee” (which expression shall unless repugnant to the context or meaning thereof be deemed to mean and include his/her heirs, executors, administrators, successors-in-interest and permitted an assigns). [Please insert details of other allottee(s), in case of more than one allottee] The Promoter and Allottee shall hereinafter collectively be referred to as the “Parties” and individually as a “Party”.

Examples of Flooring Work in a sentence

  • Metropolitan Regional Housing AuthorityTender No. MET19-151 Flooring Work- Various Locations SPECIFICATIONS – FLOORING TILE / CARPET 4 SURFACE PREPARATION .1 The Contractor is to examine surfaces to receive flooring and is to report areas considered to be beyond levelling to the Metropolitan Regional Housing Authority.

  • Discussion.Session 11Ethics Readings: The Code of Ethics of the American Anthropological Association (AAA); preamble and the 7 “commandments” http://ethics.aaanet.org/ethics-statement-0- preamble/ PDFChapters 10 & 11 & 15 in H&M, pp.

  • Flooring Work in these areas must be scheduled after ACS Normal Working Hours.

  • We Hereby guarantee that the Flooring Work done at BRBNMPL Main Press, Salboni under work order No ………………….shall remain intact and free of any defect for a minimum period of 05 years from the date of completion of the work as certified by BRBNMPL.

  • Job No. 5032.010Bid Release 1 – Bid Packages: 06A – General Trades Work, 09A – Acoustical and Drywall Work, 09B – Resilient Flooring Work, 09C – Painting Work, 21A – Fire Protection Work, 22A– Plumbing Work, 23A – HVAC Work and 26A – Electrical Work.

  • Place: RatlamDate: AllotteeAnnexure- A Payment PlanAt the time of booking : On Starting on Plinth : On First Floor : On Third Floor : On Start of Brick Work : On Start on Plaster Work : On Start of Flooring Work : On Possession :% of Total cost.

  • We hereby guarantee that the Flooring Work done at BRBNMPL Main Press, Salboni under work order No ………………….shall remain intact and free of any defect for a minimum period of 01 year from the date of completion of the work as certified by BRBNMPL.

  • Item No.49:-Carr ing out Plinth treatment to (Existing Structure) Before Flooring Work /existing structure by spraying chemical solution for termite control treatment All Floor Area, All internal Wall Area , including all wood work, all Storage, as per directed by Engg In charge.

  • However, when asked, children who come to Delta Cultura’s center speak openly about corporal punishment.49 Children often tell stories of students having to suffer through corporal punishment.

  • Proposal: Amend the Constitution and Bylaws to make clear that the Sanctions Chair is appointed by the General Chair with the advice and consent of the Board.


More Definitions of Flooring Work

Flooring Work. Vitrified tiles size 2’x2’ flooring in all rooms and ceramic tiles in bathrooms floors. Toilet : Designer tiles up to 7' door height matching, Sanitary chrome plated fitting. Doors : Flush doors with Dewas section, alluminium hardware fitting. Windows : Powder coated three track alluminium window with mosquito net & MS Grill. Electrification : Modular electrical switches. Wiring : Concealed fire retardant copper wiring with security through MCB's.

Related to Flooring Work

  • Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);

  • Base Building Work means the base building work for the Building as described in this Manual.

  • piece-work means any work the pay for which is estimated by the amount of work performed irrespective of the time occupied in its performance;

  • Tenant Improvements Defined in Exhibit B, if any.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • a work means the outcome of building or civil engineering works taken as a whole which is sufficient in itself to fulfil an economic or technical function;

  • Electrical work Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” mark modular electrical accessories, Landline phone conduit, Cable TV wiring conduit, Separate line for inverter connection, Air-conditioner power point. Painting : Long Lasting and weather resistant acrylic paint to all external walls, All internal walls with white cement based putty finish with OBD. Plumbing & Sanitation : Sanitary ware for toilets, plumbing fixtures, CPVC/UPVC pipe and fitting(ISI make), SWR drainage system. Kitchen: Granite platform, ceramic tiles dado upto 2’ height, Stainless Steel sink in Kitchen, Aquaguard point, Connection for washing machine in wash area.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • The Work means each and every activity required for the successful performance of the services described in Section II, the Terms of Reference.

  • Tenant’s Work means all improvements, alterations, fixture, equipment, and signage installation, and furniture placement necessary or appropriate for the conduct of the Permitted Use, including all work described as Tenant’s Work on Exhibit D, attached (the “Work Letter”).

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • tidal work means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Structural components means liners, leachate collection systems, final covers, run-on/run-off systems, and any other component used in the construction and operation of the MSWLF that is necessary for protection of human health and the environment.

  • Landlord Work means the work, if any, that Landlord is obligated to perform in the Premises pursuant to a separate agreement (the “Work Letter”), if any, attached to this Lease as Exhibit C.

  • Construction Work means any work in connection with

  • Work crew means a program of partial confinement

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Major Work means any Work to Construct or Maintain the Distribution System that costs more than One Hundred Thousand ($100,000.00) Dollars;

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • Unavoidable Delays means delays due to any of the following, and only the following, (provided that such delay is beyond Construction Manager’s reasonable control): war, insurrection, civil commotion, strikes, slowdowns, lock outs, riots, flood, earthquakes, fires, casualties, acts of God, acts of a public enemy, acts of terrorism, epidemics, quarantine restrictions, freight embargoes, lack of transportation, governmental moratoriums, unusually severe or abnormal weather conditions, failure of utilities, or a court order which causes a delay (unless resulting from a wrongful act of Construction Manager). In no event shall the application to Construction Manager of any applicable law, regulation, rule or other governmental requirement constitute an Unavoidable Delay. Contractor shall use reasonable good faith efforts to notify Owner not later than five (5) days after Construction Manager knows of the occurrence of an Unavoidable Delay. An extension of time for an Unavoidable Delay shall only be for the period of the Unavoidable Delay, which period shall commence to run from the time of the commencement of the cause of the Unavoidable Delay.

  • Major renovation means the renovation of a building where:

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;