Floor Layer definition

Floor Layer means a person who lays floors in terrazzo or similar composition in which marble, slate, or similar stones are used in the making thereof, and shall include persons casting or laying down precast work, but shall not include persons assisting or labouring in the operation.
Floor Layer means an employee who is registered as such with the Council and who is engaged in one or more of the following activities: laying and fixing of all types of floor or wall coverings, including wood, composite rubber, resilient flooring, linoleum, asphalt tiles, or asphalt based materials, cork, rubber, vinyl, and plastic composition or any other similar material excluding carpeting, and supervising of assistant floor layers and general workers.

Examples of Floor Layer in a sentence

  • Superintendent: $ 35.00 Sprinkler Installer: $ 85.00 Cement Finisher: $ 27.00 Millwrights: $ 88.00 ▇▇▇▇▇: $ 46.00 HVAC Technician: $ 75.00 ▇▇▇▇▇▇▇▇▇: $ 27.00 Pipefitter: $ 55.00 Laborer: $ 19.00 Plumber: $ 60.00 Drywall Finisher: $ 28.00 Sheet Metal Worker:$ 60.00 Plasterer: $ 32.00 Electrician: $ 58.00 Ironworker ▇▇▇▇▇▇▇: $ 90.00 Ironworker: $ 85.00 Painter: $ 28.00 Floor Layer: $ 30.00 Other Charges: Material: Billed at cost + 12 %.

  • GROUP 1: Carpenters, Floor Layer, Shin- gler, Drywall Applicator, Installer of metal studs, metal framing, acoustical material, metal parti- tions, porcelain and enamel and metal panels, Marlite and rigid or flexible plastic laminates, weather stripping and insulation, asbestos ▇▇▇▇▇- ment worker, hazardous waste worker.

  • Superintendent: $ 50.00 Sprinkler Installer: $ 90.00 Cement Finisher: $ 30.00 Millwrights: $ 68.00 ▇▇▇▇▇: $ 48.00 HVAC Technician: $ 60.00 ▇▇▇▇▇▇▇▇▇: $ 30.00 Pipefitter: $ 60.00 Laborer: $ 25.00 Plumber: $ 60.00 Drywall Finisher: $ 40.00 Sheet Metal Worker:$ 60.00 Plasterer: $ 45.00 Electrician: $ 55.00 Ironworker ▇▇▇▇▇▇▇: $ 85.00 Ironworker: $ 80.00 Painter: $ 40.00 Floor Layer: $ 50.00 Other Charges: Material: Billed at cost + 15_ %.

  • Superintendent: $ 37.62 Cement Finisher: $ 23.62 ▇▇▇▇▇: $ 44.20 ▇▇▇▇▇▇▇▇▇: $ 27.61 Laborer: $ 17.64 Drywall Finisher: $ 38.43 Plasterer: $ 41.16 Ironworker ▇▇▇▇▇▇▇: $ 50.50 Ironworker: $ 44.62 Painter: $ 32.13 Floor Layer: $ 30.24 Other Charges: Material: Billed at cost + 15 %.

  • LABOR RATES Superintendent: $ 65.00 Sprinkler Installer: $ 115.00 Cement Finisher: $ 37.50 Millwrights: $ 85.00 ▇▇▇▇▇: $ 60.00 HVAC Technician: $ 85.00 ▇▇▇▇▇▇▇▇▇: $ 37.50 Pipefitter: $ 85.00 Laborer: $ 32.00 Plumber: $ 85.00 Drywall Finisher: $ 50.00 Sheet Metal Worker:$ 85.00 Plasterer: $ 56.00 Electrician: $ 70.00 Ironworker ▇▇▇▇▇▇▇: $ 110.00 Ironworker: $ 100.00 Painter: $ 50.00 Floor Layer: $ 60.00 Other Charges: Material: Billed at cost + 20_ %.

  • GROUP 1: Carpenters, Floor Layer, ▇▇▇▇▇▇▇▇, Drywall Applicator, Installer of metal studs, GROUP 2: Saw Filer, Stationary Machine Operator, Pile Driver, ▇▇▇▇▇▇▇▇▇ & Wharf Builder, Automatic Pile Threader.

  • Superintendent: $ 44.02 Cement Finisher: $ 27.64 ▇▇▇▇▇: $ 51.71 ▇▇▇▇▇▇▇▇▇: $ 32.03 Laborer: $ 20.64 Drywall Finisher: $ 44.96 Plasterer: $ 48.16 Ironworker ▇▇▇▇▇▇▇: $ 59.09 Ironworker: $ 52.21 Painter: $ 37.59 Floor Layer: $ 35.38 Other Charges: Material: Billed at cost + 15 %.

  • Carpenter, Joiner, Stonemason, Plumber, Bricklayer, Signwriter, Painter, Glazier, Licensed drainer, Repainter, Plasterer, Floor Layer, Wall and Floor Tiler, Roof Tiler, Roof Fixer, Rigger, Drainer, Dogperson, Mobile Conrete Pump Operator, Waterproofer, Scaffolder, Concrete Finisher means a person holding a qualification as a result of satisfactorily completing an industry or nationally accredited course as defined in Clause B1.1(d).

Related to Floor Layer

  • Public building and "public work" means a public building of, and a public work of, a governmental entity (the United States; the District of Columbia; commonwealths, territories, and minor outlying islands of the United States; State and local governments; and multi-State, regional, or interstate entities which have governmental functions). These buildings and works may include, without limitation, bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works.

  • Floor coating means an opaque coating that is labeled and designed for application to flooring, including but not limited to, decks, porches, steps, and other horizontal surfaces which may be subject to foot traffic.

  • Commercial Premises Means a place of trade or premises operated for financial gain, including but not limited to, a retirement village or a block of flats that has a common facility; a place of trade where the manufacture and production of products or produce takes place; a site where renovation, restoration and refurbishment work as described in Appendix B takes place.

  • Commercial building means a non-residential building other than an agricultural building, an industrial building or an institutional building.

  • Sludge dryer means any enclosed thermal treatment device that is used to dehydrate sludge and that has a maximum total thermal input, excluding the heating value of the sludge itself, of 2,500 Btu/lb of sludge treated on a wet-weight basis.