Finished floor definition

Finished floor means the bottom of the floor joist or horizontal member of top of the next higher floor above the lowest floor. For the purposes of the National Flood Insurance Program Elevation Certificate (FEMA Form 81-31), the finished floor shall equal the top of the next higher floor as depicted on the Elevation Certificate.
Finished floor. MEANS "TOP OF FLOOR SLAB" AT CARPETED AREAS AND "TOP OF FLOOR FINISH" AT AREAS WITH WOOD FLOORING OR RESILIENT TILE.
Finished floor means the finished horizontal base of any story of a dwelling unit, or group of dwelling units, that meets all building code requirements for a habitable space. (Ord. 475 § 1 (part), 1996)

Examples of Finished floor in a sentence

  • Finished floor levels shown on the endorsed plans must not be altered or modified without the prior written consent of the Responsible Authority.

  • Finished floor height elevations and all new paving dimensions and elevations.

  • Finished floor shall not sound hollow when tapped with a wooden mallet.

  • Finished floor must be clean, streak free, and free from strings, bristles, or dust streaks.

  • Finished floor shall be level, not varying more than 0.062” in 10 feet or 0.125” overall.

  • Finished floor levels shown on the endorsed plans must not be altered or modified without the prior written consent of the responsible authority.

  • Finished floor elevations for all habitable structures shall be at or above the 100-year floodplain elevation.

  • Finished floor elevation or the lowest building entry elevation must be no less than 6 inches above finished grade around the building.

  • Construction hours will be developed in consultation with the Cities of Beverly and Salem, and with MassDOT and the MBTA.

  • The combination of several methodologies and data sets and, when possible, the comparison of estimates derived by different methods allows estimation of indicators that would otherwise not be estimable and also the assessment of biases and inaccuracies of estimates obtained on the basis of each data set or method used separately.In section 2 data and methods are explained, in section 3 results are presented and in section 4 the discussion is reported.

Related to Finished floor

  • Wood floor wax means wax-based products for use solely on wood floors.

  • OC Floor An amount equal to 0.50% of the Pool Balance as of the Cut-Off Date.

  • SOFR Floor means a rate of interest per annum equal to 0 basis points (0.00%).

  • Ground floor means a floor of a building with a building entrance on an accessible route. A building may have more than one ground floor.

  • Yard means the land other than publicly owned land around or appurtenant to the whole or any part of a residential or non-residential property and used or capable of being used in connection with the property.

  • Dried flower means all dead cannabis that has been harvested, dried, cured, or otherwise processed, excluding leaves and stems.

  • Lowest floor means the lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access, or limited storage in an area other than a basement area is not considered a building's lowest floor, provided that such an enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this ordinance.

  • Total Floor Area means, the sum total of the total areas of all floors in a building or structure whether at above or below grade measured between the exterior faces of the exterior walls of the building or structure or from the centre line of a common wall separating two uses or from the outside edge of a floor where the outside edge of the floor does not meet an exterior or common wall, and;

  • Floor means the benchmark rate floor, if any, provided in this Agreement initially (as of the execution of this Agreement, the modification, amendment or renewal of this Agreement or otherwise) with respect to LIBO Rate.

  • Modular building means, but shall not be limited to, single and multifamily houses, apartment

  • Modular building manufacturer means a person or corporation who owns or operates a

  • LCC-300 Cost Centre L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Residential Floor Area means all of the square footage of living area within the perimeter of a residential structure, not including any carport, walkway, garage, overhang, patio, enclosed patio, or similar area. The determination of Residential Floor Area shall be made by reference to the building permit(s) issued for such Assessor’s Parcel.

  • Gross Floor Area means the total floor area, measured between the outside of exterior walls or between the outside of exterior walls and the centre line of party walls dividing the building from another building, of all floors above the average level of finished ground adjoining the building at its exterior walls;

  • Containment building means a hazardous waste management unit that is used to store or treat hazardous waste pursuant to the provisions of Subpart DD of 35 Ill. Adm. Code 724 and Subpart DD of 35 Ill. Adm. Code 725.

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Taximeter means any device for calculating the fare to be charged in respect of any journey in a hackney carriage or private hire vehicle by reference to the distance travelled or time elapsed since the start of the journey, or a combination of both; and

  • Commercial building means any building other than a residential building,

  • Rear Yard means a yard extending across the full width of a parcel measured perpendicularly from the rear wall(s) of the main building situated on the parcel to the rear property boundary of the parcel [see sketch in Schedule B];

  • Suite means an elevated box or suite which is customarily an enclosed private or collective compartment inside the Stadium, with direct access to guests’ Seats, which are separated from other Seats in the Stadium.

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Floor coating means an opaque coating that is labeled and designed for application to flooring, including but not limited to, decks, porches, steps, and other horizontal surfaces which may be subject to foot traffic.

  • Construction, panel, and floor covering adhesive means any one-component adhesive that is designed exclusively for the installation, remodeling, maintenance, or repair of:

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Buffer area means an area of natural or established vegetation managed to protect other components of a Resource Protection Area and state waters from significant degradation due to land disturbances.