Finished Ceiling definition

Finished Ceiling shall consist of Building standard HVAC system, 4 'x 4' grid, Base Building sprinkler system, ceiling tiles, crosstees, one (1) VAV box/fan powered box per 1200 square feet, ▇▇▇▇▇ Ornni diffusers (1 per 300 USF) and corresponding soft duct, and parabolic light fixtures (1 per 100 USF), all installed by the Landlord at its cost, in accordance with Tenant's Construction Drawings, to the extent that the quantities above are met. • Electrical service to the electrical closet on each floor proposed for Tenant, with circuit breakers in place. • Base Building sprinkler system installed to meet code in accordance with the Tenant's plan assuming 25% enclosed maximum, 75% open space minimum. White semi-recessed sprinkler heads with escutcheons will be installed at Landlord's expense within 6" radius of center of each 2' x 2' (Second Look) tile pattern upon completion of the ceiling grid. • All non-asbestos product insulation installed in exterior walls and underside of slab per code. • Floor slabs shall be flash patched to achieve a smooth surface and prepared for carpet installation. All vertical penetrations shall be filled. • Plumbing connections shall be "roughed in" and available for vent, and hot and cold water at all wet columns. • Fire systems shall be installed and operating per code. The system will include, but not be limited to, an auto dialer in the building, required pull stations on floor and HVAC smoke detectors. • Finished elevator lobbies on the first (}st) floor, common and exit corridors on the first (15t) floor and restroorns on all floors. All areas shall be in compliance with ADA standards. The Landlord is to deliver the 2nd floor elevator lobby to Tenant in accordance with this section. -37- BOI 15687368.6/32203-000154 • All inspections and/or certifications required to complete the above items. (Shell Occupancy Certificates from the Township and the PA Dept. of Labor & Industry) • Interior surfaces of the exterior walls shall be finished in drywall and ready for paint. • All interior columns on the floor proposed for Tenant shall be finished in drywall and ready for paint. • Exterior and interior steel "I" beam columns will be sheathed with gypsum wallboard including taping, floating and sanding to a paint-ready surface. • Approximately 5" wide extruded aluminum sill. • All exterior windows shall receive 1" mini blinds and all interior atrium windows shall use a frosted glass pattern. • ▇▇▇▇▇▇▇▇▇ 15/16" Prelude exposed tee system. Ceiling wi...

Examples of Finished Ceiling in a sentence

  • Floor to Floor 11.5 feet typical Finished Ceiling Height 9 feet on typical office floors HVAC System The HVAC system will be floor by floor, water cooled, self contained, variable air volume (VAV), air conditioning units.