Final EIS definition
Examples of Final EIS in a sentence
The Parties to this Memorandum will work collaboratively to develop a schedule for completion ofmajor tasks including development ofthe Proposed Action, BA, BiOp(s), Draft EIS, and Final EIS.
Any conditions would be included in the ▇▇▇▇ or Final EIS (FEIS).
The second case may occur if barred owl populations do not respond and recover within 3 to 5 years as anticipated in the Final EIS (USFWS 2013b, p.
Each Party will then work with FPISC, CPRA, and any other relevant Parties to avoid or minimize the delay, and the Parties will update the CPP to ensure that the environmental review, consultations and Final EIS are completed within the timetable discussed in Section IV.C, above, or under a revised timetable modified pursuant to 42 USC 4370m-2(c)(2)(D).
Each comprehensive report shall be provided to DHEC and the Commission and made available on the Project’s public website and as provided in Appendix D to the Final EIS.
The Corps shall provide a comprehensive report at: (a) the end of pre- construction; (b) the end of construction; and (c) the end of the 10-year monitoring program, as such periods are described in Appendix D of the Final EIS.
These two additional continuous water quality monitoring stations are intended to supplement the eight continuous water quality monitoring stations proposed in Appendix D of the Final EIS and will be subject to the same criteria for Pre-Construction Monitoring, Monitoring During Construction and Post Construction Monitoring as specified in Appendix D to the Final EIS.
In addition to the water quality monitoring set forth in or required by the Final EIS and other governmental approvals, the Corps will provide continuous daily water quality monitoring with two additional monitors at locations to be jointly agreed-upon by the Corps, Commission, and DHEC, to be installed simultaneously with the eight continuous water quality monitoring stations proposed in Appendix D of the Final EIS.
The SEPA review associated with any City actions as described in Section 7 of this MOU shall have been completed through issuance of a Final EIS.
Specifically, neither the Corps nor the GPA admits that the SHEP as described in the Engineers’ Report, the ROD, Final EIS and Final GRR was or is not in compliance with the requirements of law, including, but not limited to, all laws referenced herein.