Final Acceptance Testing definition

Final Acceptance Testing means the act of validation of the Integrated Logistic Support System to be carried out by the Contractor in accordance with the Contract as documented in the Integrated Logistic Support Plan;
Final Acceptance Testing means (i) with respect to the S-BSS Work, the reviews and tests to be conducted during the Operational Verification Phase for [***], including without limitation as part of the Operational Readiness Review and the Operational Acceptance Review (all as further described in Exhibit A) to determine whether the S-BSS Deliverable Items associated with [***] conform with the Specifications and whether the S-BSS Work associated with [***] otherwise meets the requirements of this Contract, and (ii) with respect to the Chipset Work, the reviews and tests to be conducted during the Operational Verification Phase, including without limitation the Operational Readiness Review (all as further described in Exhibit A2) to determine whether the Satellite Chipset Deliverable Items associated with each phase conform with the Specifications and whether the Chipset Work associated with each phase otherwise meets the requirements of this Contract.
Final Acceptance Testing is defined, with respect to Legacy Combination Receivers, in Exhibit A (Development Schedule and Specifications) and, with respect to the TE Solution implemented in a DIRECTV TE Receiver, in the TE Solution Statement of Work.

Examples of Final Acceptance Testing in a sentence

  • Final Acceptance Testing will be performed by Seller’s operator and consist of (i) Seller’s standard acceptance-test procedure which checks all aspects of Goods performance against Seller’s quoted Technical Specification and (ii) any additional tests that are mutually agreed upon and specified in the purchase order or statement of work referencing these Terms and Conditions.

  • Upon successful completion of the Final Acceptance Testing, the Goods shall be accepted, and Buyer shall sign and deliver to Seller the Seller’s acceptance certificate (“Installation Completion”).

  • The bidder is required to ensure that the competent team of OEM conducts an audit of the implemented solution (production environment or test environment as decided by IFTAS), in order to confirm that implementation and configuration has been done as per OEM best practices and the design is suitable to deliver the required uptime, and the required performance before Final Acceptance Testing i.e., Stabilization certificate is issued by the OEM.

  • It has failed to show that the allegation of discrimination played no part whatsoever in the Respondent’s actions in failing to investigate adequately or make findings that were more than superficial.

  • The purchaser shall conduct Final Acceptance Testing on receipt of intimation of commission of the whole project from the bidder.

  • The Final Acceptance Testing (FAT) for rolled-out application shall be tested for both remotely & onsite basis.The application tested for acceptance testing & Final Acceptance Testing is observed over one month for Stabilization, Reliability & Consistency of the solution.

  • Perform a Preliminary Inspection and Test to determine the operating status of components and systems prior to Final Acceptance Testing.

  • After testing reports, as-built drawings, and required manuals have been submitted for review, the Contractor shall coordinate a date for Final Acceptance Testing.

  • Training Materials: The following minimum training materials will be required to be prepared by the SI to facilitate the training of users: FAT & Go-LiveSI will assist in successful completion of Final Acceptance Testing (FAT) and audit of the system on the completion of the roll-out of each phase and will submit a Go-Live Report for each phase.

  • After the County has completed such testing or upon expiration of the testing period (the "Final Acceptance Testing Period"), the County shall notify the Contractor in writing that the System, and all components and Deliverables that are a part thereof: (a) meet the Acceptance Criteria and that final acceptance of the System and such components and Deliverables has occurred ("Final Acceptance"); or (b) does not meet the Acceptance Criteria and the reasons therefor.


More Definitions of Final Acceptance Testing

Final Acceptance Testing means the reviews and tests to be conducted during the Operational Verification Phase for Release 2, including without limitation as part of both the Operational Readiness Use or disclosure of the data contained on this sheet is subject to the restriction on the title page. Review and the Operational Acceptance Review (all as further described in Exhibit A) to determine whether the Deliverable Items associated with Release 2 conform with the Specifications and whether the Work associated with Release 2 otherwise meets the requirements of this Contract.
Final Acceptance Testing is defined in Exhibit A (Development Schedule and Specifications).

Related to Final Acceptance Testing

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.

  • Final Acceptance Date means the date on which Final Acceptance occurs.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Final Acceptance Certificate means the certificate that shall be issued by the Engineer to the Contractor upon the satisfactory completion of the contract by the Contractor.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Cannabis testing facility means an entity registered by

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Conditional Acceptance means a conditional acceptance by the Liquidity Provider of an extension of the Scheduled Termination Date.

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Drug test means a test designed to detect the illegal use of a controlled substance.