FDT definition
Examples of FDT in a sentence
A disaster recovery test is conducted with FDT on at least an annual basis.
In special cases where CLEC is ordering Unbundled Loop with LNP, the FDT must be agreed upon, the interval to reach agreement will not exceed two (2) days from receipt of an accurate LSR.
Considerations such as system down time, Switch upgrades, Switch maintenance, and the possibility of other CLECs requesting the same Frame Due Time (FDT) in the same Switch (Switch contention) must be reviewed.
In the event that any of these situations would occur, Qwest will negotiate with CLEC for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC).
If the Project Coordinated Installation includes LNP, CLEC will also have appropriate personnel scheduled for the negotiated FDT.
In cases where the electronic Driver Vehicle Inspection Report (eDVIR) and/or the electronic Car Condition Report (eCCR) system has been installed, drivers can view previous reports from any Feeder Data Terminal (FDT).
Considerations such as system down time, Switch upgrades, Switch maintenance, and the possibility of other CLECs requesting the same FDT in the same Switch (Switch contention) must be reviewed.
In the event that any of these situations would occur, Qwest will coordinate with CLEC for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC).
In the event that any of these situations would occur, CenturyLink will negotiate with CLEC for an agreed upon FDT, prior to issuing the Firm Order Confirmation (FOC).
Upon successful completion of the ORT, Signature Automation shall submit a record copy of the test results to the Owner and Engineer and request the scheduling of the FDT.