FCDC definition
Examples of FCDC in a sentence
All plans submitted to FCDC for review and approval shall be in English units.
Within 7 Days after First Notice to Proceed (NTP1), the Contractor shall notify FCDC representatives in writing of Project commencement.
Generally, ditch flows occur between April 1 and November 1, but working windows for demolition and construction shall be coordinated with FCDC.
The Contractor shall be responsible to FCDC for all damages for delays that may be sustained by FCDC caused by any interference that could have been avoided by proper handling of the Work.
The Contractor shall design and construct the Project in accordance with the requirements included in the executed Irrigation Company Agreement for Construction between CDOT and FCDC (including written specifications, standards of practice, and construction methods) and the standards referenced in Book 3.
The Contractor shall coordinate the required ditch design reviews with FCDC.
The Contractor shall obtain FCDC approval in writing of design plans for all of the Work within its ROW.
The Contractor shall obtain FCDC approval in writing, in advance, of methods and procedures covering all Work within the ditch ROW.
The Contractor shall ensure all Work on ditches allows future maintenance to be performed outside of the ROW by FCDC without disruption to the operation or maintenance of US 550.
The Contractor shall coordinate with FCDC prior to beginning any construction that affects the operation or flow of the ditch.