Factory Test definition
Examples of Factory Test in a sentence
E.8.6. In the event MIMOS does not attend the Factory Testing, two (2) copies of the Factory Test results for each shipment of the Equipment and Software, as evidence of conformity of the Equipment and Software with the Specifications, shall be supplied to MIMOS by the Contractor free of charge to reach MIMOS seven (7) working days before the proposed shipment of the Equipment and Software.
Microsoft Office product format 10 Contractor Project Team D2-06 Factory Acceptance Test for System Staging • Documented Factory Test Plan.
After the witnessing of factory tests by the Inspector (if any) has been satisfactorily completed, the Inspector shall issue a "Factory Test Certificate for Goods" which is signed by both Parties.
This period includes manufacturing of the Product, a documented Factory Test and shipment to the Delivery Location.
In addition we will have ATEEM staff attend the following electrical panel and motor control center witness testing: Factory Test ~ 2 days allowed, Field Test ~ 3 days allowed, Startup Test ~ 4 days allowed.
The Contractor shall successfully complete ▇▇▇▇ (Section C-9 of the SOW) and FAT on all POM hardware units (CLINs 0219, 0220, 0221, 0222 0224, and 0225), as defined in the Government approved, Contractor developed POM Acceptance Test Procedures (CDRL A075) using certified Factory Test Equipment.
The IMU Factory Test Equipment shall be used as described in Section C-7.1.8 of the SOW, and certified as described in Section C-7.4 of the SOW.
The Government will certify that all Contractor developed Factory Test Equipment meets the requirements of the Factory Test Equipment Certification Test Plan (CDRL A074).
ACL shall receive, if requested by YZN, YZN engineers to visit ACL factory and witness the aforesaid Factory Test.
Prior to performing formal POM FAT as described in Section C-10 of the SOW, the Government will certify that the MK 48 MOD 7 APB6/TI-1 IMU Factory Test Equipment meets the requirements of the Factory Test Equipment Certification Test Plan (CDRL A074) If the Contractor chooses to procure the IMU from a qualified vendor other than the source controlled vendor, the Contractor shall provide a Test/Inspection Report – Vendor certified test report (CDRL A077) from the vendor.