Examples of Facility structure in a sentence
Natural disaster, bombing, or other event which damages the Facility structure, mechanical systems or utilities; andd.
And, the OIG emphasized in the audit that NNSA and MOX Services failed to meet the DOE’s accepted design-review practices: In fact, the review was performed on only the construction package for the MOX Facility structure and did not include all the integral systems, structures and components.
All proposed Towers and any other proposed Wireless Telecommunications Facility structures shall be set back from abutting parcels, recorded rights-of-way and road and street lines by the greater of the following distances: A distance equal to the height of the proposed Tower or Wireless Telecommunications Facility structure plus ten percent (10%) of the height of the Tower or structure, or the existing setback requirement of the underlying zoning district, whichever is greater.
To minimize adverse impacts upon surrounding nearby residential uses, the minimum setback of structures and uses associated with the Solar Facility, including fencing, PV panels, parking areas, and outdoor storage, but not including landscaping and berming, shall be not less than 500 feet from the nearest dwelling existing at the time the Solar Facility was approved by the County to the nearest Solar Facility structure (typically the fencing).
The total costs of the UPC will consist of- costs of remuneration for judges of the Court of First Instance and of the Court of Appeal (see Part V, Sections 2 and 3)- costs of remuneration of the Registrar, the Deputy-Registrar and other non-judge staff (including staff for the training framework and for the Patent mediation and arbitration centre) (see Part V, Sections 4 and 5),- lump-sums for interpretation and training framework for judges (see Part V, Section 4) and- costs for facilities (see Part VI).
Lot Size and Setbacks.All proposed Towers and any other proposed Wireless Telecommunications Facility structures shall be set back from abutting parcels, recorded rights-of-way and road and street lines by the greater of the following distances: A distance equal to the height of the proposed Tower or Wireless Telecommunications Facility structure plus ten percent (10%) of the height of the Tower or structure, or the existing setback requirement of the underlying Zoning District, whichever is greater.
Facility structure: The facility is structured in such a manner that upon generation of sufficient stock based on a sales agreement entered into with the agent under a rolling arrangement, the borrower draws down on the facility to an agreed amount.
Facility structure and support areas such as electrical and mechanical rooms, loading/unloading docks, and ramps.
Certify that there shall be no advertising or promotional lettering on any WECS Facility structure, WECS Tower, turbine, nacelle or blade beyond the manufacturer’s or applicant’s logo on the nacelle of the turbine as approved by Sweetwater County.
All proposed Towers and any other proposed Wireless Telecommunications Facility structures shall be set back from abutting parcels, recorded rights-of-way and road and street lines by the greater of the following distances: A distance equal to the height of the proposed Tower or Wireless Telecommunications Facility structure plus ten percent (10%) of the height of the Tower or structure, or the existing setback requirement of the underlying zoning district, which ever is greater.