F5 definition

F5 means (a) F5 Networks Ltd. if the Customer’s primary place of business is located in Europe, the Middle East or Africa (“EMEA”); (b) X0 Xxxxxxxx Xxxxxxxxx Pte Ltd if the Customer’s primary place of business is located in the Asia-Pacific region (“APAC”); or (iii) F5 Networks, Inc. if the Customer’s primary place of business is located in a region outside of EMEA or APAC.
F5 means F5 Networks, Inc.;
F5. “we,” or “us” refers to the applicable F5 entity as follows: (a) if your primary place of business is located in Europe, the Middle East, or Africa (“EMEA”), the F5 entity is F5 Networks Ltd.; (b) if your primary place of business is located in the Asia-Pacific region (“APAC”), the F5 entity is F5 Networks Singapore Pte Ltd; and (c) if your primary place of business is located in a region outside of EMEA or APAC, the F5 entity is F5, Inc.

Examples of F5 in a sentence

  • F.5. Continuation Funding Information and RequirementsOrganizations that have current AmeriCorps State and National awards that will be in program Year 2 or Year 3 in FY 2024 are considered continuation applicants.

  • F-5 Withdrawal of Proposals Proposal may be withdrawn on a written or telegraphic (faxed) request dispatched by the proposer in time for delivery in the normal course of business prior to the time specified herein for proposal receipt, provided that written confirmation of any telegraphic withdrawal with the signature of the proposer is placed in the mail and postmarked prior to the time specified herein for proposal receipt.

  • A core product of the division, F5 Networks’ Internet traffic manage- ment system also posted favorable sales growth and gained considerable attention in the market for its high network- availability and stability.

  • A relatively large proportion of neurons in F5 seemed to have the same properties (di Pellegrino et al., 1992).

  • At low embedding rates, the detection of F5 is also lower when compared to other methods, which is likely due to matrix embedding that decreases the number of embedding changes.With decreasing message length, the results of the classification naturally become progressively worse.

  • Water-Reducing Admixture: ASTM C 494/C 494M, Type A.2. Retarding Admixture: ASTM C 494/C 494M, Type B.3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.

  • We will briefly discuss these algorithms, e.g., linearization, XL, XSL, Gr¨obner bases algorithms like Buchberger algorithms, F4 and F5.

  • It correctly recognized the images as stego images (only 1.5% were classified as cover images) and assigned most of the images (62.5%) to F5 and 29.6% to MB1.

  • We assume that Φ includes the sorts S for subjects, R for resources, A for actions, and the pred- icate symbol Permit of the sort S × R × A → {T, F}.5 Φ may also include sorts to represent environmental data such as the current time and location.

  • Rows 27 and 29 are populated from the detailed analysis of these amounts which are input in table F5 Financing Costs.


More Definitions of F5

F5 refers to an AFRA rate applicable to a vessel size classification of LR-1, or Large Range 1. This vessel classification references tanker vessels ranging in size from 45,000 Long Tons Deadweight to 79,999 Long Tons Deadweight. In order to derive an approximation of the relationship between Deadweight and Gross Registered Tons for a nominal vessel consistent with this vessel size classification, the average size characteristics of two vessels that have transported LSFO or crude oil to Hawaii are used as reference data. These vessels are described as follows: Name Deadweight Tons(DWT) Gross Registered Tons(GRT) ---- -------------------- -------------------------- S/T ARCO Prudhoe Bay 71,342 35,646 S/T ARCO Sag River 71,342 35,646 ------ ------ Average 71,342 35,646 The Worldscale rate data that is to be included in the computation of tanker freight price formula components "FRD1" and "FRD2," consistent with the computation of "F5," is to be derived in the same manner as the following illustrative example calculations:
F5 we" or "us" in
F5 means F5 Networks, Inc. and its predecessors, successors, subsidiaries, affiliates, divisions, and assigns.
F5 means the Original Issue Price of Series Angel Preference Share,

Related to F5

  • GAC10 means granular activated carbon filter beds with an empty-bed contact time of 10 minutes based on average daily flow and a carbon reactivation frequency of every 180 days, except that the reactivation frequency for GAC10 used as a best available technology for compliance with MCLs under subsection 9.2.1.2 shall be 120 days.

  • deforestation means direct human-induced conversion of forested land to non-forested land.

  • T2 means the real time gross settlement system operated by the Eurosystem, or any successor system.

  • M2 is the calendar month, expressed as a number, in which the day immediately following the last day of the Interest Period falls;

  • Panchayat means an institution (by whatever name called) of self-government constituted under article 243B, for the rural areas;

  • m3 means cubic metre of gas and "10³m³" shall mean 1,000 cubic metres of gas;

  • M1 is the calendar month, expressed as a number, in which the first day of the Interest Period falls;

  • Gateway means the BT electronic gateway, used for all ordering or fault reporting as described in the relevant section of the Handbook;

  • Crosswalk means that part of a roadway at an intersection included within the connections of the

  • L2 means the Bidder who has quoted second lowest price in the Reverse Auction process.

  • MVAR means megavolt ampere of reactive power.

  • Class I renewable energy means electric energy produced from

  • GoWB means Government of West Bengal

  • Class II renewable energy means electric energy produced at a

  • PM10 means particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers as measured by an EPA reference or equivalent method.

  • Through highway means every street or highway as provided in section 4511.65 of the Revised Code.

  • MT means metric tons.

  • RFT means Request for Tender.

  • ESFA means the Education and Skills Funding Agency.