Exterior Elevations definition

Exterior Elevations when capitalized means those conceptual exterior elevations of the Hotel which are attached hereto as Exhibit 3. The Exterior Elevations are the agreed upon starting point for the development of the Preliminary Plans and Specifications and the Plans and Specifications and are not to be materially changed without the written consent of the County which shall be obtained as provided for in Article 3.

Examples of Exterior Elevations in a sentence

  • On or before the date set forth on the Project Schedule, Landlord shall cause to be prepared and submitted to Tenant plans and specifications based upon the Project Description, the exterior of which shall incorporate the Exterior Elevations set forth on Exhibit D (collectively, the “Shell Building Plans and Specifications”).

  • The Site Plan, Exterior Elevations and Schematic Plans for the Premises are attached as Exhibit A hereto.

  • Landlord has previously permitted access and provided site and other additional information sufficient to allow the Tenant’s Architect/Engineer/Designer to prepare Site Plans and Exterior Elevations, Civil Site and Utility Plans, Preliminary Plans (all disciplines), Final Plans (all disciplines) as defined below.

  • Any exterior building materials used in connection with the constructions, maintenance or repair of the Revised Project shall be substantially consistent with the [Siding Specifications (Section 074600)] referenced in the Exterior Elevations included with the Revised Plans and Materials.

  • Within thirty (30) days after receipt of Landlord’s approval of the Site Plan and Exterior Elevations, Tenant shall provide complete Preliminary Plans for Landlord’s review and approval.

  • Exterior Elevations shall depict the building exterior appearance and finishes from each compass direction.

  • Drawings consisting of 11 sheets, with each sheet bearing one of the following general titles: General Building Information, Specifications, Accessibility Standards, Demolition Plan, First Floor Plan, Reflected Ceiling Plan, Foundation & Framing Plan, Exterior Elevations, Perspectives, Sections, and Details.

  • This procedure will be repeated until Landlord ultimately approves the Site Plans and Exterior Elevations.

  • Exterior Elevations with floor-to-floor heights and material selection.

  • Exterior Elevations: with floor to floor heights, floor elevations, exterior materials and fenestration.