ETWB definition
Examples of ETWB in a sentence
In order to monitor the disposal of C&D materials at the public fill reception facility and landfill and to control fly-tipping, a trip-ticket system should be included (see ETWB TCW No. 31/2004 for details).
To ensure that air ventilation impacts are duly considered as one of the main criteria in the planning and design process, a Technical Circular on Air Ventilation Assessment was promulgated in July 2006 by the then Housing, Planning and Lands Bureau and Environment, Transport and Works Bureau (HPLB TC No. 1/06 and ETWB TC No. 1/06).
Participation in a local collection scheme should be considered if one is available Working site / during construction All contractors 🗸 WBTC and ETWB TCW * All recommendations and requirements resulted during the course of EIA Process, including ACE and/or accepted public comment to proposed project.
The tree removal application shall include a tree survey plan and a tree assessment schedule, including tree preservation and protection measures for the trees to be retained and a compensatory planting proposal as required in ETWB TCW No. 3/2006.
The Consultants shall also check and carry out all formalities required under ETWB TC(W) No. 54/2002 for executing the Articles of Agreement.
Working site / during construction All contractors 🗸 WBTC and ETWB TCW EIA Ref.
In the event that there are non-DP components in the Project that will not be covered in any other EIA study, the Consultant shall propose a suitable approach to meet the environmental requirements for the Project following the relevant procedures stipulated in ETWB 13/2003.
The Consultants shall engage insurance experts to advise on specific insurance needs for the construction and operation of the Plant in accordance with ETWB TC(W) No. 7/2005.
The Consultants shall prepare electronic copies of the tender documents for dissemination to the tenderers in accordance with the provision of the ETWB TC(W) No.11/2005 or its subsequent revisions.
According to the Circular ETWB TCW No. 16/2005, government projects shall adopt the renewable energy based on the criteria set up in the Appendix B of Circular (ETWB, 2005).