Equipment Verification definition
Examples of Equipment Verification in a sentence
Table L-2 summarizes the Performance Testing and Equipment Verification Program.
The Contractor shall report the performance of major equipment, using data collected either during Unit 6 Performance Testing or individual Equipment Verification Testing.
TABLE: Summary of Functional Performance Tests Equipment Verification Visually inspect all equipment and components comprising the system.
The Contractor and the Test Contractor may share the responsibility for the Major Equipment Verification as outlined in Table L-2.
The Test Contractor shall be responsible for the Performance Test Plan (PTP), test instrumentation including calibration and set up, pre and post test uncertainty analysis, conduct of the testing, data acquisition, data reduction, post test calculations, and test report for ▇▇▇▇ ▇ Performance Testing, Steam Generator and Steam Turbine Testing, Plant Baseline Data and Major Equipment Verification (except where excluded in Table L-2).
TABLE: Summary of Functional Performance Tests Pre-Functional Testing Equipment Verification Visually inspect all equipment and components comprising the system.
Report the performance of major equipment, using data collected either during Unit 6 Performance Testing or individual Equipment Verification Testing.
TABLE: Summary of Functional Performance Tests Description Methods/Criteria Equipment Verification Visually inspect all equipment and components comprising the system.