Engineering Unit definition
Examples of Engineering Unit in a sentence
All supervisory, confidential, or managerial employees, and employees assigned to other Bargaining Units, are specifically excluded from the Scientific and Engineering Unit.
The Employer agrees to furnish all new employees in the Scientific and Engineering Unit a packet of informational materials to be supplied to the Employer by the Union.
Wherever the department’s objective of teamwork will not be unreasonably disrupted by a one-half hour lunch period, if requested by a Scientific and Engineering Unit employee, a one-half hour lunch period shall be scheduled.
If a determination is made that additional subsurface information is required, the Design-Build Team shall use a prequalified geotechnical firm to perform all additional subsurface investigation and laboratory testing in accordance with the current NCDOT Geotechnical Engineering Unit Guidelines and Procedures Manual for Subsurface Investigations.
Submit the proposed remedial measures to the Geotechnical Engineering Unit for review and acceptance prior to incorporation.
Any deviations to the requirements noted above shall require acceptance from the NCDOT Geotechnical Engineering Unit prior to construction.
Submit additional information collected by the Design-Build Team to the NCDOT Geotechnical Engineering Unit for review and acceptance in the following format: • 8 ½ x 11-inch Paper Format • “Structure Subsurface Investigation Title Sheet.” Includes Caution Notice and an area to list Contents.
Obtain the services of a firm prequalified for geotechnical work by the NCDOT Geotechnical Engineering Unit at: The prequalified geotechnical firm shall prepare foundation design recommendation reports for use in designing structure foundations and roadway foundations, retaining walls, and temporary structures if necessary.
In all other cases, where operationally feasible, a Scientific and Engineering Unit employee’s request to be scheduled for a one-half hour lunch period will not be unreasonably denied.
The Engineer has determined, with the concurrence of the Mn/DOT Concrete Engineering Unit, that it is in the best interest of the state and traveling public to incorporate the latest specifications into this Contract.