Examples of Engineer Representative in a sentence
CERTIFICATE The measurements on the basis of which the above entries for the Running Bill No. -------------------------- were made have been taken jointly on --------------------- and are recorded at pagesto of measurement book No. Signature and date of Contractor Signature and date of Architects Signature and date of Site Engineer Representative (Seal) The work recorded in the above-mentioned measurements has been done at the site satisfactorily as per tender drawings, conditions and specifications.
Signature andSignature andSignature anddate of Contractordate of Architectsdate of Site Engineer Representative (Seal) The work recorded in the above mentioned measurements has been done at thesite satisfactorily as per tender drawings, conditions and specifications.
The Field Service [Engineer] [Representative] and the Contractor shall be responsible for initial programming of the lighting control system including, but not limited to setting of all presets, control groupings, time program controls and similar functions, based upon information obtained by interviewing the Owner to determine building operating parameters.
The Field Service [Engineer] [Representative] shall provided a minimum of [16] [4] hours of on-site training for Owner personnel in system operation, maintenance and programming.
The use of dozers to remove snow requires written approval by the Sale Administrator (SA) or Maintenance Engineer Representative (MER).
The Field Service [Engineer] [Representative] shall demonstrate the operation of the system to representatives of the Owner and Engineer.
Upon completion of testing, the system shall be completely checked out by a factory-trained Field Service [Engineer] [Representative] who shall be responsible for initial programming and startup of the system.
The Contractor shall report to the Engineer Representative if any existing work is defective and obtain his instructions before proceeding with new work which may cover up the defective work or which may be adversely affected by the defective work.
The Architect/Engineer shall develop and prepare a Project budget in a format acceptable to the State Engineer Representative, including a detailed estimate of construction costs, dated the actual date the estimate is made.
An organization structure and the line of communication were set up for the Project between the Project Proponent, Engineer Representative (ER), Independent Environmental Checker (IEC), the Contractor and Environmental Team (ET).