Examples of DWQ in a sentence
Revisions to the current CWA § 208 areawide treatment management plans or promulgations/revisions to TMDLs (40 CFR 130.7) approved by the EPA and adopted by DWQ which calls for different effluent limitations than contained in this permit.
Notify DWQ within 24 hours of any stream turbidity standard exceedances that are not brought into compliance.During the Environmental Assessment required by Article 230-4 of the 2012 Standard Specifications for Roads and Structures, the Design-Build Team shall define the point at which the discharge enters into the State’s surface waters and the appropriate sampling locations.
I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party.
The permittee shall submit within 14 calendar days of knowledge of the release a written description of: the release (including the type and estimate of the amount of material released), the date that such release occurred, the circumstances leading to the release, and measures taken and/or planned to be taken to the Division of Water Quality (DWQ), 288 North 1460 West, P.O. Box 144870, Salt Lake City, Utah 84114-4870.
This discharge is also regulated under State Water Resources Control Board Order No. 2003 - 0017 - DWQ, "General Waste Discharge Requirements for Dredge and Fill Discharges that have received State Water Quality Certification" which requires compliance with all conditions of this Water Quality Certification.The Applicant shall be liable civilly for any violations of this Certification in accordance with the California Water Code.
Report violations of the NPDES permit to the Engineer who will notify the DWQ Regional Office within 24 hours.
The requirements of this Certification are enforceable through Water Quality Order No. 2003-0017-DWQ, Statewide General Waste Discharge Requirements for Discharges of Dredged or Fill Material that have Received State Water Quality Certification (Water Quality Order No. 2003-0017- DWQ).
Revisions to the current CWA § 208 area wide treatment management plans or promulgations/revisions to TMDLs (40 CFR 130.7) approved by the EPA and adopted by DWQ which calls for different effluent limitations than contained in this permit.
The State Water Board adopted General Waste Discharge Requirements for Sanitary Sewer Systems, (WQ Order No. 2006-0003- DWQ; SSO WDR) on May 2, 2006, to provide a consistent, statewide regulatory approach to address sanitary sewer overflows.
Notify DWQ within 24 hours of any stream turbidity standard exceedances that are not brought into compliance.During the Environmental Assessment required by Article 230-4 of the 2018 Standard Specifications, the Contractor shall define the point at which the discharge enters into the State’s surface waters and the appropriate sampling locations.