Developer Remediation Component definition

Developer Remediation Component means that portion of the Remedial Improvements, which is the responsibility of the Developer with respect to the Site. The Developer Remediation Component shall include the preparation of, submittal to, and approval from Responsible Agencies and implementation of the following; the Schedule of Activities, workplan and other Remediation work necessary in connection with construction of buildings, pile support system, if any, reconstruction and/or repair as required for components of the remedial improvements previously installed including, design and construction of the underground utility trench, Vegetative Maintenance Plan and Smart Irrigation Plan, and Deed Restrictions, each as defined in the RAP.
Developer Remediation Component means that portion of the Remedial Improvements, which is the responsibility of the Developer with respect to the Site. The Developer Remediation Component shall include the preparation of, submittal to, and approval from Responsible Agencies and implementation of the following; the Schedule of Activities, workplan and other Remediation work necessary in connection with construction of buildings, pile support system, if any, reconstruction and/or repair as required for components of the remedial improvements previously installed including, Construction Quality Assurance Plan and Requirements, design and construction of the underground utility trench, Vegetative Maintenance Plan and Smart Irrigation Plan, Closure Plan, Financial Assurance Plans, and Deed Restrictions, each as defined in the RAP. The Developer Remediation Component also includes the Final Cover/Asphalt Cap, as conditionally approved in Noticed Environmental Doc #86, dated February 10, 2010 and such additional obligations as may be imposed by RWQCB in connection with a revised RAP admission special development proposal.

Examples of Developer Remediation Component in a sentence

  • The Developer will construct, at its cost and expense, the Developer Remediation Component.

  • Developer shall construct or cause to be constructed the Developer Remediation Component as referenced in Section 301.2. Developer shall ensure that the construction of the Developer Remediation Component shall be in accordance with the City and Responsible Agencies requirements, Approved RAP, and the Environmental Deed Restrictions.

Related to Developer Remediation Component

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • Licensed site remediation professional means an individual

  • Performance Tests means all tests meant to ensure that the Plant(s)/Unit(s) is/are in all respects in accordance with the requirements of the Contract and that the Plant functions properly and smoothly, in all respects as per the approved design parameters, within the permissible tolerances, and satisfies all the stipulated operating parameters, and will include the Guarantee Tests.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".