Project Start Date means the first Milestone Start Date specified in Schedule B;
Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.
Make-Ready Work means all work performed or to be performed to prepare AT&T-22STATE’s Conduit Systems, Poles or Anchors and related Facilities for the requested occupancy or attachment of CLEC’s Facilities. Make-Ready Work includes, but is not limited to, clearing obstructions (e.g., by rodding Ducts to ensure clear passage), the rearrangement, transfer, replacement, and removal of existing Facilities on a Pole or in a Conduit System where such work is required solely to accommodate CLEC’s Facilities and not to meet AT&T-22STATE’s business needs or convenience. Make-Ready Work may require “dig ups” of existing Facilities and may include the repair, enlargement or modification of AT&T-22STATE’s Facilities (including, but not limited to, Conduits, Ducts, Handholes and Manholes) or the performance of other work required to make a Pole, Anchor, Conduit or Duct usable for the initial placement of CLEC’s Facilities.
Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.
Design-build means the procurement of design professional services and construction by the use of a single contract.