delay start mode definition

delay start mode. ’ means a standby mode that facilitates the activation of active mode by timer; and
delay start mode. ’ means a standby mode in which activation of an active mode is facilitated by a timer;
delay start mode means a condition where the household dishwasher automatically starts the cleaning cycle at a later time;

Examples of delay start mode in a sentence

  • Delay start mode is a one off user-initiated short duration function that is associated with an active mode.* * * * *1.6 IEC 62301 refers to the test standard published by the International Electrotechnical Commission, titled ‘‘Household electrical appliances— Measurement of standby power,’’ Publication 62301 First Edition 2005–06.

  • Delay start mode is a one-off, user-initiated, short-duration function that is associated with an active mode.’’ 76 FR 58346, 58363 (Sep.

  • Delay start mode is a one-off, user-initiated, short-duration function that is associated with an active mode.” 76 FR 58346, 58363 (Sep.

  • To run BIS on a rolled-back installation, set the service manually to run in Automatic (Delay start) mode.


More Definitions of delay start mode

delay start mode means a condition where the household washing machine or the household washer dryer automatically starts the washing cycle or drying cycle at a later time;
delay start mode. ’ means a standby mode that facilitates the activation of
delay start mode means a condition where the user has selected a specified delay to the beginning of the cycle of the selected programme;
delay start mode. ’ means a standby

Related to delay start mode

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Supply Start Date means the date(s) specified in clause 2.8;

  • Single tomogram system means a CT x-ray system which obtains x-ray transmission data during a scan to produce a single tomogram.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Federal work authorization program means any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), D.L. 99-603.

  • Commercial Software means Software developed or regularly used that: (i) has been sold, leased, or licensed to the general public; (ii) has been offered for sale, lease, or license to the general public; (iii) has not been offered, sold, leased, or licensed to the public but will be available for commercial sale, lease, or license in time to satisfy the delivery requirements of this Contract; or (iv) satisfies a criterion expressed in (i), (ii), or (iii) above and would require only minor modifications to meet the requirements of this Contract.

  • Cannabis testing facility means an entity registered by

  • Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.

  • Cabinet x-ray system means an x-ray system with the x-ray tube installed in an enclosure independent of existing architectural structures except the floor on which it may be placed. The cabinet x-ray system is intended to contain at least that portion of a material being irradiated, provide radiation attenuation, and exclude personnel from its interior during generation of radiation. Included are all x-ray systems designed primarily for the inspection of carry-on baggage at airline, railroad, and bus terminals, and in similar facilities. An x-ray tube used within a shielded part of a building, or x-ray equipment that may temporarily or occasionally incorporate portable shielding, is not considered a cabinet x-ray system.

  • Stand Alone System Upgrade Facilities means System Upgrade Facilities that a Developer may construct without affecting day-to-day operations of the New York State Transmission System during their construction. NYISO, the Connecting Transmission Owner and the Developer must agree as to what constitutes Stand Alone System Upgrade Facilities and identify them in Appendix A to this Agreement.

  • Expiry Date (Data di Scadenza) means the "Expiry Date" as specified in § 1 of the Product and Underlying Data.

  • voltage ride through as used herein shall mean the ability of a Small Generating Facility to stay connected to and synchronized with the system or equipment of the Transmission Owner and any Affected Systems during system disturbances within a range of under-voltage and over-voltage conditions, in accordance with Good Utility Practice and consistent with any standards and guidelines that are applied to other generating facilities in the Balancing Authority Area on a comparable basis.

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Phase III means Phase I (or Phase I/II), Phase II (or Phase II/III) and Phase III clinical trials, respectively, in each case as prescribed by applicable FDA IND Regulations, or any corresponding foreign statutes, rules or regulations.

  • multi-system operator or “MSO” means a cable operator who has been granted registration under rule 11 of the Cable Television Networks Rules, 1994 and who receives a programming service from a broadcaster and re-transmits the same or transmits his own programming service for simultaneous reception either by multiple subscribers directly or through one or more local cable operators;

  • Generator Operator means the Person that Operates the Generating Facility and performs the functions of supplying electric energy and interconnected operations services within the meaning of the NERC Reliability Standards.

  • X-ray high-voltage generator means a device which transforms electrical energy from the potential supplied by the x-ray control to the tube operating potential. The device may also include means for transforming alternating current to direct current, filament transformers for the x-ray tube(s), high-voltage switches, electrical protective devices, and other appropriate elements.

  • Private Cloud System (PCS) A cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the Requester, a third party, or some combination of them, and it may exist on or off premises.

  • Network Termination Point (NTP) means the physical point at which a subscriber is provided with access to a public communications network; in the case of networks involving switching or routing, the NTP is identified by means of a specific network address, which may be linked to a subscriber number or name;

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Multiple tomogram system means a computed tomography X-ray system which obtains X-ray transmission data simultaneously during a single scan to produce more than one tomogram.

  • Small cell facility means a wireless facility that meets both of the following qualifications: (i) each antenna is located inside an enclosure of no more than six cubic feet in volume, or, in the case of an antenna that has exposed elements, the antenna and all of its exposed elements could fit within an imaginary enclosure of no more than six cubic feet and (ii) all other wireless equipment associated with the facility has a cumulative volume of no more than 28 cubic feet, or such higher limit as is established by the Federal Communications Commission. The following types of associated equipment are not included in the calculation of equipment volume: electric meter, concealment, telecommunications demarcation boxes, back-up power systems, grounding equipment, power transfer switches, cut-off switches, and vertical cable runs for the connection of power and other services.

  • Application Software means Software formulated to perform specific business or technical functions and interface with the business or technical users of the System and is identified as such in Appendix4 of the Contract Agreement and such other Software as the parties may agree in writing to be Application Software.

  • 911 system means the set of network, database and customer premise equipment (CPE) components required to provide 911 service.