Define Unit definition
Define Unit. This is measured by the completion of each sidewalk grinding location. This will be performed on an as requested basis.
Define Unit. This is measured by the completion of each drain stencil, and the proper documentation to the City of Lake Forest. This will be performed on an as requested basis.
Define Unit. This is measured by the amount of drive approach area in square feet that is to be removed and replaced. The surface area will be measured in square feet. The thickness of drive approaches shall be 6” or greater to match existing. This will be performed on an as requested basis.
Examples of Define Unit in a sentence
Acre) Define Unit: This is measured by acre and is performed twice a year.
Crew Hours) Define Unit: This item is measured in crew hours for the support of the City two annual events, “4th of July Parade” and “Snow Fest” Both events are performed on an annual basis.
Each) Define Unit: This is measured by each standard sign supplied.
Each) Define Unit: This is measured by each standard sign removed and replaced.
More Definitions of Define Unit
Define Unit. This is measured by each drain or catch basin or inlet cleaned by manual labor and hand tools. See Appendix H. This activity will be performed on an annual basis.
Define Unit. This is measured by each CDS cleaned.. See Appendix H. This activity will be performed on an annual basis.
Define Unit. This is measured by the amount of storm drain in linear feet inspected with video or electronics. This is measured from the start to the finish of the pipeline inspected. This activity will be performed on an annual basis.
Define Unit. This is measured by each sign post installed and replaced. This will be performed on an as requested basis.
Define Unit. This is measured by the amount asphalt concrete in square feet that is used to repair streets. This will be performed on an as requested basis.
Define Unit. This is measured by each dissipater cleaned. See Appendix H. This activity will be performed on an annual basis. Quality Requirements: At the end of each work session, storm drains should be cleaned removing any debris, work site cleaned, drains shall be cleaned pursuant to proper standards and specifications and the quantity of debris removed shall be fully documented. All work to be to the satisfaction of the Engineer.