cubic capacity definition

cubic capacity means in respect of any unfired pressure vessel, the volumetric capacity measured in cubic feet;
cubic capacity means the cubic capacity of the building or, if the building is divided into compartments, the compartment of which the element of structure forms part; and
cubic capacity means the volume of cylinder of a motorcycle engine;

Related to cubic capacity

  • New Capacity means a new Generator, a substantial addition to the capacity of an existing Generator, or the reactivation of all or a portion of a Generator that has been out of service for five years or more that commences commercial service after the effective date of this definition.

  • Excess capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if-it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • Maximum Capacity or ‘Pmax’ means the maximum continuous active power which a power-generating module can produce, less any demand associated solely with facilitating the operation of that power-generating module and not fed into the network as specified in the connection agreement or as agreed between the relevant system operator and the power-generating facility owner;