CTUIL definition

CTUIL or “Central Transmission Utility of India Ltd” shall mean the Central Transmission Utility notified under Section 38 of the Electricity Act, 2003.

Examples of CTUIL in a sentence

  • Metering shall be on the 33kV side of 33/400kV Internal Pooling substation PSS-I & II where the power from the Solar Power Project shall be injected and on the 400 kV Side of 400/765kV substation of CTUIL.

  • Any “Change in Law” event that impacts GIPCL financially, shall be passed on to the SPDs irrespective of whether SPD is able to claim relief for the same from the Power Procurer/ CTUIL/ Government.

  • The Ministry of Power, Government of India has notified CTUIL as the Central Transmission Utility (CTU) in exercise of the powers conferred under sub section (1) of section 38 of the Electricity Act, 2003 vide Gazette Notification No. S.O. 1095(E).

  • As per Clause 15.2 of the RE Connectivity Procedure, CTUIL shall monitor the utilization of the dedicated transmission infrastructure.

  • Failure to update progress of the monitoring parameters shall be considered as adverse progress and CTUIL shall be entitled to take appropriate actions as per applicable Regulations/Detailed Procedure.

  • GIPCL, as part of Solar Power Park Developer, has agreed to identify and acquire land required and develop various infrastructure facilities like internal Power Evacuation system along with transmission system up to CTUIL, water supply, road connectivity, drainage system etc.

  • Provided that the Central Transmission Utility of India Limited (CTUIL) and REC PDCL may at any time, disclose the terms and conditions of transactions contemplated hereby to any person, to the extent stipulated under the law or the Bidding Guidelines.

  • Each Party may change its Liaison for a given Requested Gene/Designated Gene at any time upon written notice (including by email) to the other Party’s Liaison.

  • Further, for approval of con- nectivity, all necessary documents as required by CTUIL / PGCIL / WRLDC / WRPC or any other authority shall be submitted by SPD.

  • All the necessary compliances up to Point of Interconnection i.e. 400kV side of Khavda PSS-II of CTUIL, like Study Reports / Models, additional equipment for reactive power support etc., as required by the WRLDC shall be in the scope of SPD.

Related to CTUIL

  • WADA means the World Anti-Doping Agency.

  • aeroplane means a power-driven heavier-than-air aircraft, deriving its lift in flight chiefly from aerodynamic reactions on surfaces which remain fixed under given conditions of flight;

  • OJEU means the Official Journal of the European Union.

  • SUR means the software use rights agreements which include additional or supplemental terms and conditions under which Software is licensed and which is made available on ▇▇▇.▇▇▇.▇▇▇/▇▇▇▇▇▇▇/▇▇▇▇▇.

  • SAQA means the South African Qualifications Authority;