CQQ definition
Examples of CQQ in a sentence
Proposer must complete and submit Form CQQ, Company Qualifications Questionnaire for this section of its Response.
The EUP may also be rejected if it does not conform to requirements of Section 5.05 or if the CQQ is not properly completed or does not show that the EUP is Conforming Material or the Material or CQQ otherwise does not meet the requirements of this CONTRACT.
The first sample shall be analyzed by TENEX to confirm that the EUP is Conforming Material and conforms to the requirements of this CONTRACT and the results shall be the basis for filling in the CQQ; the second sample shall be Delivered to USEC together with the respective Cylinder filled with EUP.
The CQQ shall include the gross weight of the filled Cylinder and net weight of the EUP it contains and shall be provided in the forms set forth in Appendix F1.
All measured and weighing values shall be stated in the CQQ, in kilograms rounded to the nearest integer number of kilograms, taking into account that the first decimal equal or less than 4 leaves the integer unchanged, the first decimal greater than 5 increases the integer by 1, and if the first decimal is equal to 5, the integer is increased by one if the integer is odd while if the integer is even the integer is unchanged.
In the event of a mistake in the CQQ that can be corrected through rejection and replacement of the CQQ instead of the EUP, USEC shall request, and TENEX shall provide, such replacement CQQ in lieu of the procedures set forth herein.
A CQQ shall accompany each Cylinder and Sample Container Delivered to USEC.
DocuSign Envelope ID: FC73BE0B-3903-4659-82E3-10CDDCE94116 SUBPROVIDER NAME: CQQ Testing & Engineering LLC Project Manager 10 to 20 $97.00 Project Engineer 10 to 15 $88.00 Engineer-In-Training 1 to 5 $65.00 Senior Engineer Tech 15+ $80.00 Engineer Tech 5 to 15 $55.00 Junior Engineer Tech 1 to 5 $38.00 Senior Geologist 15+ $85.00 Geologist 5 to 15 $80.00 Admin/Clerical $48.00 Contract rates include labor, overhead, and profit.
The Parties shall include in the working procedures agreed pursuant to ▇▇▇▇▇▇▇▇▇ ▇▇-▇▇, the requirements that must be met for the use of 1S Sample Containers, as well as the format for the CQQ for EUP in 1S Sample Containers.
The umpire’s results shall be conclusive on all Parties if such results are within the range determined by TENEX's and USEC's results (as USEC’s results are reflected on the CQQ).