MWAc Input 1 Control House Primary revenue meter 100 MWh [______] MWAC Output 1 Control House Primary revenue meter 100 MWh [______] Time 2 Control House Clock 6 hours 1 second resolution Temperature 2 Field Met station RTD TBD 1.5% All measurement devices will be calibrated by a qualified technician reasonably acceptable to Purchaser with appropriate supporting documentation.
Control House Equipment modifications and Grounding Grid modifications were modified.
The wire taps to all PT’s and arresters will be 336 Al. Control House – Three (3) new control panels will be installed in the west end of the control house.
Control House • Communication, SCADA, and Relay and control Package • Provide OPGW and 69kV line conductor from SR Turkey Creek substation to the new EKPC 69 kV switching station (South Lancaster Switching) • Associated Dead-end and Structural Support Steel and foundations • The collector substation will include reactive compensation equipment to meet the power factor requirements of Section 4.7 of Appendix 2 to the Queue #AE2-254 Interconnection Service Agreement.
The major work entails the replacement of the roadway deck and supporting stringers, replacement of the median, replacement of pedestrian fence, rehabilitation of the mechanical operating systems, complete replacement of the electrical operating systems including replacement of the submarine cables with droop cables, rehabilitation of the Control House, the two Machinery Houses, ▇▇▇▇▇▇▇’▇ House and the two Gateman’s Shelters.
This includes the HLOW Control House, LLOW Gate Chamber, ▇▇▇▇▇▇ Canal Bypass vaults (inlet structure, outlet structure, transfer valve vault), Poudre River Diversion Structure, Forebay Inlet/Outlet structure, and other hydraulic structures with features to be operated or maintained by NISP Enterprise staff.
Control House Equipment modifications and Grounding Grid modifications will be required.
As such, Lessee acknowledges that Lessor shall have continuous and uninterrupted access to the Control House for the purpose of operating, maintaining or repairing Lessor’s Equipment throughout the Term of this Lease.
Duplex switchboard panels 1, 2, 3, 4, 7, 8 and 9 in 345kV switchboard #1 and duplex switchboard panels 1, 2, 4 and 5 in 345kV switchboard #2 located in Control House #1; and switchboard panels 1, 2, 6, 7 and 8 in 345kV switchboard #3 and duplex switchboard panels 1, 2, 3, 4 and panel 5R in 345kV switchboard #4 located in Control House #2.
New steel support structures for bus, switches, and CCVT stands will be installed • Control House - Existing Control House has adequate room for additional breaker relay panels.