Examples of Contractor Site in a sentence
Proper daily record of cement, steel and bitumen consumption shall be maintained at site by the Contractor/ Site Engineer.
J.8-1 List of Tables PART I—THE SCHEDULETable 1 - Contractor Site Loaded Labor Rates During the Contract J-1Table 2 - Government Site Loaded Labor Rates During the Contract .......................................
CONTRACTOR SITE SAFETY AND HEALTH OFFICER The Contractor Site Safety and Health Officer(s) will be categorized as either a Full-time Safety Professional or a Collateral Duty Safety Officer based on the scope and size of the project.
Section J, Attachments 2 (Government Site) and 3 (Contractor Site) of the Basic Contract provide competitive Loaded Hourly Labor Rates within CONUS for T&M and L-H type Orders only.
The information being shared in this Statement of Work, the reference documents provided and any information or data collected during the Contractor Site Visit are CONFIDENTIAL to the State of Arizona.
The Contractor Site Safety and Health Officer shall be primarily responsible for ensuring the safe work performed under this contract.
Any discrepancy between measurements and conditions listed within the Specifications and those actually incurred on the job will be the total responsibility of the Contractor; Site Inspection is available to bidders to eliminate any possibility of such problems.
Without limiting the generality of the foregoing, the Contractor Site Safety and Health Officer shall: Review all subcontractor and sub-tier contractor's Site Specific Accident Prevention Plan and Activity Hazard Analysis for compliance with applicable safety standards.
Attachment 1: Acronyms and Abbreviations Attachment 2: Cost/Price – Government Site (Contractor’s Cost/Price- Government Site – Contractor’s Proposal dated 11/17/06 is incorporated herein by reference.) Attachment 3: Cost/Price – Contractor Site (Contractor’s Cost/Price-Contractor Site – Contractor’s Proposal dated 11/17/07 is incorporated herein by reference.) Attachment 4: Labor Category Descriptions Attachment 5: Federal Enterprise Architecture/Department.
The Contractor shall perform the following Section C PWS sections of the Master IDIQ Contract consistent with the predecessor contractor’s baseline: Section C.1 Transition, Item (k) Graded Approach: No later than 15 days after NTP of Task Order 2, a detailed plan to address the SRS Operations Contractor, Site Lab Contractor, and other Site Contractors services needed will be provided.