Contract for construction definition

Contract for construction means a contract for which a lien may be established
Contract for construction means the separate Contract between the Board and the Contractor covering all construction services.
Contract for construction means the agreement between the Authority and the Contractor governing the construction of all or a portion of the School Facilities Project and all other documents setting forth the obligations of the Contractor with respect to construction of the School Facilities Project.

Examples of Contract for construction in a sentence

  • Contractor shall restrict access to the areas of the facility not specifically included in this Contract for construction services.

  • This policy is applicable if a Contractor has been awarded a multi-year Contract for construction and/or maintenance services of at least $10,000,000 in Contract value.

  • The Bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid and entering into a Contract for construction of the Works.

  • Bidders are encouraged to visit the site and he/she shall examine the Site of Works and its surroundings and obtain for himself/herself all information that may be necessary for preparing the bid and entering into a Contract for construction of the Works.

  • The bidder is informed that the pre-BID site visit is mandatory and he/she shall examine the Site of Works and its surroundings and obtain for himself all information that may be necessary for preparing the bid and entering into a Contract for construction of the Works.

  • The term "subcontract" under this section is considered to refer to a person who agrees to perform any part of the labor or material requirements of a Contract for construction, alteration or repair.

  • July 19, 2011.408.875 Contract for construction, repair, remodeling, or demolition of facility; prohibitions concerning bid specifications, project agreements, or other controlling documents.Sec.

  • When separate Contracts are awarded, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Contract for construction.

  • The Contract Documents issued by or on behalf of the DISTRICT under a Contract for construction of the PROJECT.

  • For any Contract for construction, the amount of which exceeds $100,000, the Contractor shall furnish to the County the bonds required under Sections 2.2-4336 and 2.2-4337 of the Code and shall otherwise fully comply with the requirements of such sections of the Code.


More Definitions of Contract for construction

Contract for construction means the contract between Miami Dade College and the Contractor for the performance of Work at an MDC Project. For MDC Projects where the construction delivery system is construction management, the term “Contract for Construction” shall refer to Miami Dade College/CM Agreement.
Contract for construction. Contract for Construction" shall mean a legally binding agreement with Contractors. 1.15

Related to Contract for construction

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Original construction ’ shall mean the first or initial construction

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • the Constitution means the Constitution of the Republic of South Africa, Act 108 of 1996

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the project, and (ii) the cumulative payments made by the developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility. Interconnection Customer:

  • Foreign construction material means a construction material other than a domestic construction material.

  • GENERAL AND SPECIAL CONDITIONS OF CONTRACT means the instructions to Tenderer and General and special conditions of contract pertaining to the work for which above tenders have been called for.

  • Construction and demolition debris means and includes:

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • WTO GPA country construction material means a construction material that—

  • Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.