Examples of Consumer Meter in a sentence
Failure of Consumer Meter to Register (1) If a consumer meter is sound to have ceased to register, such meter shall be repaired or replaced by the licensee within seven days.
The Distribution Licensee shall undertake meter reading of both, the Renewable Energy Generation Meter and the Consumer Meter or Net Meter, as applicable, for all Eligible Consumers, according to the regular metering cycle.
The Distribution Licensee shall undertake meter reading of both, the Renewable Energy Generation Meter and the Consumer Meter for all prosumers, according to the regular billing cycle.
It is to state that, under this scheme various activities were covered like New Feeder / Feeder Bifurcation, Underground Cable work, Distribution Transformers, LT Line Augmentation, Aerial Bunch Cables, Consumer Meter Replacement, New Connections, HVDS etc.
The Distribution Licensee shall undertake meter reading of both, RE Generation Meter and the Consumer Meter or Net Meter, as applicable, for all Eligible Consumers, according to the regular metering cycle.
By Order of the Commission Sd /- SECRETARY I/cAnnexure- 1 System sideGrid SideSPDSPDDC isolator SwitchAC Isolator SwitchCMSMBatteryMain consumer panelPCULOADDistribution TransformerSolar PanelsOverview of a basic grid interactive Photo Voltaic system SPD- Surge Protective Device, PCU- Power Conditioning Unit, SM-Solar Generation Meter, CM- Consumer Meter (Net meter or Bi-directional meter) * The actual connectivity diagram may vary depending upon site specification.
This could include contacting the Consumer, Meter Equipment Manager and Distribution Network Operator / Gas Transporter, reviewing data held in the Enquiry Services or performing a site visit to confirm data associated with the meter installed at the premises.
SPD- Surge Protective Device, PCU- Power Conditioning Unit, SM-Solar Generation Meter, CM- Consumer Meter (Net meter or Bi-directional meter) *A separate/wiring arrangement should be made from inverter/charger to the consumers critical load.
Both the net meter (Consumer Meter) and gross meter (Renewable Energy Meter) shall be tested before the installation.
It is to state that, under this scheme various activities were covered like New Feeder / Feeder Bifurcation, LT Line Augmentation, Aerial Bunch Cables, Consumer Meter Replacement, New Connections, HVDS etc.