construction site means a workplace where construction work is being performed;
Construction Work means any work in connection with
Construction project means the same as that term is defined in Section 38-1a-102.
Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;
Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.
Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.
Construction Completion means physical construction of a cleanup action component is complete.
Constructional Plant means all equipments, materials, appliances or things of whatsoever nature required for execution, completion or maintenance of the works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.
Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.
Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.
Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;
Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.
Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.
Construction Plans means plans, drawings, specifications and related documents, and construction schedules for the construction of the Work, together with all supplements, amendments or corrections approved by the City in accordance with the Municipal Code and this Agreement.
Construction Plan means a representation of a project site and all activities associated with the project. The plan includes the location of the project site, buildings and other infrastructure, grading activities, schedules for implementation, and other pertinent information related to the project site. A storm water pollution prevention plan is a part of the construction plan.
Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.
Constructional Plan means all appliances or things of whatsoever nature required for the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.
construction work permit means a document issued in terms of regulation 3; "contractor" means an employer who performs construction work;
Construction-manager-at-risk means a project delivery method in which:
Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.
Construction Works means all works and things necessary to complete the Project Facilities in accordance with this Agreement;
Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.
Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of
Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.
engine type means a category of engines which do not differ in essential engine characteristics.
Prop Type Sr Lien: Orig Amount: P&&I: Cr. Score: Sevicer Loan Prod Code: Rem Term: Occp Code: Appr Value: Note Date: Debt Ratio: City Stat Zip Purpose: Curr Rate: CLTV: Prin Bal: Maturity Date: Lien Pos: 8740031 181 RFC01 $97,600.00 $24,400.00 $198.09 713 0301869988 7 181 1 $122,000.00 05/15/2003 42 CHANDLER AZ 85200 00 0.000 100 $24,400.00 06/01/2018 2 8728811 181 04 $56,755.00 $54,200.00 $514.84 735 0301861464 6 181 1 $112,000.00 05/15/2003 33 Gurnee IL 60000 00 0.000 100 $54,200.00 06/01/2018 2 8728637 181 14 $101,900.00 $25,475.00 $180.31 736 0301861845 7 181 1 $127,375.00 05/15/2003 31 CLINTON UT 84000 00 0.000 100 $25,475.00 06/01/2018 2 8718375 180 14 $136,800.00 $25,650.00 $235.60 720 0301856670 6 180 1 $171,000.00 05/15/2003 44 WENATCHEE WA 98800 00 0.000 95 $25,650.00 05/19/2018 2 8370728 181 14 $376,000.00 $47,000.00 $412.01 786 0301870333 6 181 1 $470,000.00 05/15/2003 42 Tonwship of West Windsor NJ 00000 00 0.000 90 $47,000.00 06/01/2018 2 8370488 181 09 $353,600.00 $66,300.00 $477.27 758 0301869814 7 181 1 $442,000.00 05/15/2003 34 Centreville VA 20100 00 0.000 95 $66,300.00 06/01/2018 2 8720207 181 14 $220,000.00 $65,000.00 $450.05 791 0301867941 7 181 1 $305,000.00 05/15/2003 35 Township Of Roxbury NJ 00000 00 0.000 94 $65,000.00 06/01/2018 2 8370724 181 04 $344,000.00 $64,500.00 $464.32 688 0301870432 7 181 1 $430,000.00 05/15/2003 31 Washington DC 20000 00 0.000 95 $64,500.00 06/01/2018 2 8728733 181 14 $169,004.00 $46,000.00 $450.29 691 0301861373 6 181 1 $220,000.00 05/15/2003 43 Moore OK 73100 00 0.000 98 $46,000.00 06/01/2018 2 8740067 181 09 $296,000.00 $74,000.00 $750.56 698 0301870580 6 181 1 $370,000.00 05/16/2003 42 TEMECULA CA 92500 00 0.000 100 $74,000.00 06/01/2018 2 8728667 181 14 $164,000.00 $14,450.00 $128.87 788 0301862496 6 181 1 $205,000.00 05/16/2003 44 CHELSEA AL 35000 00 0.000 88 $14,450.00 06/01/2018 2 8715337 181 09 $129,600.00 $32,400.00 $347.97 673 0301853537 6 181 1 $162,000.00 05/16/2003 43 RICHMOND TX 77400 00 0.000 100 $32,400.00 06/01/2018 2 8715329 181 14 $108,000.00 $13,500.00 $144.99 798 0301853412 6 181 1 $135,000.00 05/16/2003 50 NORTH RICHLAND HILLS TX 00000 00 0.000 90 $13,500.00 06/01/2018 2 8715331 181 14 $144,000.00 $18,000.00 $120.97 713 0301853420 7 181 1 $180,000.00 05/16/2003 23 BATON ROUGE LA 70800 00 0.000 90 $18,000.00 06/01/2018 2 8370636 181 04 $194,400.00 $24,300.00 $178.14 769 0301867180 7 181 1 $243,000.00 05/16/2003 24 Alexandria VA 22300 00 0.000 90 $24,300.00 06/01/2018 2 8727175 180 14 $51,700.00 $24,300.00 $225.13 778 0301861613 6 180 1 $82,000.00 05/16/2003 28 Ft. Wayne IN 46808 00 7.490 93 $24,300.00 05/21/2018 2 8715339 180 14 $262,400.00 $65,600.00 $458.68 734 0301851549 7 180 1 $328,000.00 05/16/2003 36 BELLINGHAM WA 98200 00 0.000 100 $65,600.00 05/16/2018 2 8728653 180 14 $237,371.00 $21,000.00 $167.09 640 0301862116 7 180 1 $300,000.00 05/16/2003 49 CANAL WINCHESTER OH 00000 00 0.000 87 $21,000.00 05/21/2018 2 8715301 181 14 $250,000.00 $47,500.00 $331.31 778 0301852554 7 181 1 $350,000.00 05/16/2003 50 WESTMINSTER MD 21100 00 0.000 85 $47,500.00 06/01/2018 2 8370722 300 14 $85,979.00 $44,200.00 $403.83 669 0301867537 8 300 1 $144,000.00 05/16/2003 45 Ypsilanti MI 48100 00 00.000 91 $44,200.00 05/22/2028 2 8724285 181 09 $235,200.00 $29,400.00 $200.06 710 0301859153 7 181 1 $294,000.00 05/16/2003 30 CARSON CITY NV 89700 00 0.000 90 $29,400.00 06/01/2018 2