Construction Sequence means the planned construction chronology by plan designers, contractors, and/or developers that describes the relationship between implementation of stormwater quality measures in relation to land disturbance.

Examples of Construction Sequence in a sentence

  • The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design.

  • The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic.

  • The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design for 30%, 60% and 100% milestones..

  • The Engineer shall prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design for 30%, 60% and 100% milestones.

  • Prepare a Preliminary Construction Sequence Layout in conjunction with the Geometric Schematic depicting the phasing and traffic detours anticipated to construct the proposed design.

  • Copies of the Preliminary Construction Sequence in a roll plot format 11.

  • The Preliminary Construction Sequence must be developed in accordance with the latest edition of the TMUTCD.

  • Each Phasing and Construction Sequence Report must address, at a 41 minimum, construction activities, construction stage limits, construction sequencing, and traffic 1 control.

  • The Lender is hereby appointed the attorney-in-fact of the Borrower and each Subsidiary (without requiring the Lender to act as such) to endorse any check which may be payable to the Borrower or any Subsidiary to collect any premiums or the proceeds of such insurance (other than proceeds of public liability insurance), and any amount so collected may be applied by the Lender toward satisfaction of any of the Obligations if an Event of Default has occurred and is continuing.

  • General Construction Sequence for Permanent Lining Example of Type 1 & 2 Self Reacting Formwork Example of Type 3 Self Reacting Formwork Traditionally when large diameter tunnel is excavated in full face, it is susceptible to the following:  Collapse of tunnel crown;  Heavy temporary support;  Tight working area with heavy machinery and workers working close to one another; and  Excessive water ingress These could possibility increase the exposure of risks to workers inside the tunnel.

Related to Construction Sequence

  • construction site means a workplace where construction work is being performed;

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction Work means any work in connection with⎯

  • Construction Completion Date or “Completion Date” means the date by which the overall Development of the Project is completed in accordance with the provisions of this Agreement and when the Completion Certificate is issued by the Authority as per Article 14.1.