Construction quality control definition

Construction quality control means a planned system of activities that is used to directly monitor and control the quality of a construction project. Construction quality con- trols are the measures under taken by the contractor or installer to determine compliance with requirements for workmanship and materials put forth in the plans and specifi- cation for the construction project.
Construction quality control or “CQC” means a planned system of operational techniques and activities used to preserve the quality of materials and ensure construction to specifications. Elements of a CQC include inspections, testing, data collection, data analysis and appropriate corrective actions.
Construction quality control means the overall system of technical activities that measures the attributes and performance of construction to verify that the construction meets the specifications;

Examples of Construction quality control in a sentence

  • Construction quality control (CQC) is intended to provide a comprehensive, common and consistent framework for quality control across various contract packages.

  • Construction quality control refers to measures taken by the installer or contractor to determine compliance with the requirements for materials and workmanship as stated in the approved construction plan.

  • Construction quality control plans should include monitoring and testing frequencies (e,g, for setting batter and maintaining horizontal and vertical control).

  • Construction quality control is normally performed by the geosynthetics manufacturer or installer, or for natural soil materials by the earthwork contractor, and is necessary to achieve quality in the constructed or installed system.

  • Construction quality control is intended to provide a comprehensive common and consistent framework of quality control which is comprised of two main elements.

  • Internal QA/QC processes • Management of external consultant/resources • Design quality control plan • Constructability and bidability review • Construction quality control requirements • Construction quality assurance program (including independent materials testing where required) 4.

  • Construction quality control should be strengthened through effective monitoring by beneficiaries.

  • Construction quality control was provided by Shannon and Wilson, Inc.

  • Construction quality control procedures will include the integrity testing of all surface water, foul water, process water pipe work and underground structures in accordance with industry accepted standards and procedures.

  • Construction quality control was provided by RJH Consultants, Inc (RJH) and CTL Thompson.

Related to Construction quality control

  • Quality control means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Construction activity means any clearing, grading or excavation associated with large construction activity or associated with small construction activity.

  • Construction Completion Certificate means a document:

  • Emission Control Strategy means any device, system, or strategy employed with a diesel-fueled CI engine that is intended to reduce emissions. Examples of emission control strategies include, but are not limited to, particulate filters, diesel oxidation catalysts, selective catalytic reduction systems, alternative fuels, fuel additives used in combination with particulate filters, alternative diesel fuels, and combinations of the above.

  • Construction Services means either of the following for construction-manager-at-risk, design-build and job-order-contracting project delivery methods:

  • Construction Plan means a representation of a project site and all activities associated with the project. The plan includes the location of the project site, buildings and other infrastructure, grading activities, schedules for implementation, and other pertinent information related to the project site. A storm water pollution prevention plan is a part of the construction plan.

  • Improvement completion assurance means a surety bond, letter of credit,

  • Construction Contractor means a person who undertakes to or offers to undertake to, or purports to have the capacity to undertake to, or submits a bid to, or does himself or by or through others, construct, alter, repair, add to, subtract from, improve, move, wreck, or demolish any building, highway, road, railroad, excavation, or other structure, project, development, or improvement to real property, or to do any part thereof. "Construction contractor" includes subcontractors, specialty contractors, prime contractors, and any person receiving consideration for the general supervision and/or coordination of such a construction project except for remediation contracting. This definition shall govern without regard to whether or not the construction contractor is acting in fulfillment of a contract.

  • Ambient air quality standard means an established concentration, exposure time, and frequency of occurrence of air contaminant(s) in the ambient air which shall not be exceeded.

  • Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.

  • Operational Control means Security monitoring, adjustment of generation and transmission resources, coordinating and approval of changes in transmission status for maintenance, determination of changes in transmission status for reliability, coordination with other Balancing Authority Areas and Reliability Coordinators, voltage reductions and load shedding, except that each legal owner of generation and transmission resources continues to physically operate and maintain its own facilities.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • construction site means a workplace where construction work is being performed;

  • Construction Plans means plans, drawings, specifications and related documents, and construction schedules for the construction of the Work, together with all supplements, amendments or corrections approved by the City in accordance with the Municipal Code and this Agreement.

  • High Quality Waters means all state waters, except:

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Nuclear fuel cycle-related research and development activities means those activities which are specifically related to any process or system development aspect of any of the following: - conversion of nuclear material, - enrichment of nuclear material, - nuclear fuel fabrication, - reactors, - critical facilities, - reprocessing of nuclear fuel, - processing (not including repackaging or conditioning not involving the separation of elements, for storage or disposal) of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Office of the Interconnection Control Center means the equipment, facilities and personnel used by the Office of the Interconnection to coordinate and direct the operation of the PJM Region and to administer the PJM Interchange Energy Market, including facilities and equipment used to communicate and coordinate with the Market Participants in connection with transactions in the PJM Interchange Energy Market or the operation of the PJM Region. On-Site Generators:

  • City contractor means any person that enters into an agreement with the City to furnish products or services to or for the City.

  • Subprojects means more than one such Subproject.