Construction Power definition
Examples of Construction Power in a sentence
The following power supply sources will be used for construction power: Muskrat Falls: A 25 kV tap from the construction power system for the Muskrat Falls Generating Facility (see Construction Power) Forteau Point: A 25 kV tap from an existing distribution system located approximately 2.5 km away.
Temporary Construction Power Supply Inspection N/A EPC Contractor Contractor will verify with ▇▇▇▇▇▇▇▇▇▇ County and Cleveland County inspections are not required.
The respective commitments and responsibilities of the Participants and Opco regarding the South Texas Project switchyard, substation and transmission facilities, including the Construction Power Line, are set forth in Exhibit A hereto (as same may be modified from time to time consistent with Opco's and the Participants' regulatory obligations).
The Construction Power system by its design and nature shall be a temporary system and not part of the permanent power supply.
Construction Power: Contractor will furnish electric power for construction at no charge for all construction needs, welding and temporary lighting.
Cogenerator shall, at its expense, install, maintain and operate facilities necessary to transmit power and energy generated at the Plant to the Cogenerator Substation and to receive Maintenance and Construction Power and Energy furnished by Company at the Cogenerator Substation and transmit same to the Plant.
By separate agreement with either Cogenerator or its contractor, Company, acting through its Texas Electric Service Company division, will furnish electric power and energy required for construction of the Plant ("Construction Power and Energy") upon its standard terms and conditions and at its rates from time to time in effect.
Temporary Construction Power – Temporary construction power will be provided by Valley Electric.
Contractor shall be responsible for making its own assessment of the quantum of Construction Power required and shall be furnished.
As the relevant percentage ratios for the Hebei Construction Power Generation Trading Agreements are more than 0.1% but less than 2.5%, the Hebei Construction Power Generation Trading Agreements are subject to reporting and announcement requirements set out in Rules 14A.45 to 14A.47 of the Hong Kong Listing Rules, but exempted from the independent shareholders’ approval requirements set out in Rule 14A.48(2) of the Hong Kong Listing Rules.